Skip to content
  • Categories
  • Recent
  • Tags
  • Popular
  • World
  • Users
  • Groups
Skins
  • Light
  • Brite
  • Cerulean
  • Cosmo
  • Flatly
  • Journal
  • Litera
  • Lumen
  • Lux
  • Materia
  • Minty
  • Morph
  • Pulse
  • Sandstone
  • Simplex
  • Sketchy
  • Spacelab
  • United
  • Yeti
  • Zephyr
  • Dark
  • Cyborg
  • Darkly
  • Quartz
  • Slate
  • Solar
  • Superhero
  • Vapor

  • Default (Cyborg)
  • No Skin
Collapse
Brand Logo

CIRCLE WITH A DOT

  1. Home
  2. Uncategorized
  3. 9GW datacentre approved.

9GW datacentre approved.

Scheduled Pinned Locked Moved Uncategorized
109 Posts 68 Posters 0 Views
  • Oldest to Newest
  • Newest to Oldest
  • Most Votes
Reply
  • Reply as topic
Log in to reply
This topic has been deleted. Only users with topic management privileges can see it.
  • syklemil@snabelen.noS syklemil@snabelen.no

    @quixoticgeek
    Solar & wind are still cheaper than gas though, so still a weird choice
    @CppGuy

    cppguy@infosec.spaceC This user is from outside of this forum
    cppguy@infosec.spaceC This user is from outside of this forum
    cppguy@infosec.space
    wrote last edited by
    #21

    @syklemil @quixoticgeek

    They're building the thing in a desert, i.e. an expanse of unused space. If they had to build this monstrosity at all, they could have used some of that space for renewable energy generation.

    1 Reply Last reply
    0
    • syklemil@snabelen.noS syklemil@snabelen.no

      @quixoticgeek
      Solar & wind are still cheaper than gas though, so still a weird choice
      @CppGuy

      brokar@mastodon.socialB This user is from outside of this forum
      brokar@mastodon.socialB This user is from outside of this forum
      brokar@mastodon.social
      wrote last edited by
      #22

      @syklemil @quixoticgeek @CppGuy

      They will be building power plants for that because no state has 9GW power lying around or spare, not even talking about the cables and infrastructure you'd need to even get the energy there.
      And since this is a desert, i assume there isn't much water around for cooling.
      Also, i can only guess the number of backup generators they'd need to secure operation. Gas powered of course. And are they talking about carbon neutrality? Being the good greenwashing company?

      1 Reply Last reply
      0
      • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

        9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

        Link Preview Image
        New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

        The 40,000-acre project will run entirely off-grid using natural gas.

        favicon

        Tom's Hardware (www.tomshardware.com)

        artemis@climatejustice.socialA This user is from outside of this forum
        artemis@climatejustice.socialA This user is from outside of this forum
        artemis@climatejustice.social
        wrote last edited by
        #23

        @quixoticgeek and isn't 'natural gas' just the most newspeak name for a fossil fuel.

        quixoticgeek@social.v.stQ 1 Reply Last reply
        0
        • artemis@climatejustice.socialA artemis@climatejustice.social

          @quixoticgeek and isn't 'natural gas' just the most newspeak name for a fossil fuel.

          quixoticgeek@social.v.stQ This user is from outside of this forum
          quixoticgeek@social.v.stQ This user is from outside of this forum
          quixoticgeek@social.v.st
          wrote last edited by
          #24

          @artemis ok. So natural gas is because for many years the gas network in most places was derived from coal gas, or town gas, whereby coal was heated up to produce coke, which was used in things like steel production, and the gas was then piped locally to homes and businesses. Natural gas as a fuel source is relatively recent. In the UK we're talking later half of the 20th century.

          artemis@climatejustice.socialA 1 Reply Last reply
          0
          • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

            9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

            Link Preview Image
            New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

            The 40,000-acre project will run entirely off-grid using natural gas.

            favicon

            Tom's Hardware (www.tomshardware.com)

            shivviness@beige.partyS This user is from outside of this forum
            shivviness@beige.partyS This user is from outside of this forum
            shivviness@beige.party
            wrote last edited by
            #25

            @quixoticgeek

            People need to understand that these datacentres are not just for generating fun pics, they're intended to replace workers en masse, and they're going to ultimately replaces wages.

            And there's no way Universal Basic Income will be even considered, and notwithstanding the BS that Musk has been spouting recently in favour of UBI.

            pst@tldr.nettime.orgP 1 Reply Last reply
            0
            • seb1982@norden.socialS seb1982@norden.social

              @quixoticgeek I would like to bring in a completely different aspect:
              As the data centre runs entirely on natural gas, sabotaging the whole facility seems to be quite an easy thing to do.

              quoidian@mastodon.onlineQ This user is from outside of this forum
              quoidian@mastodon.onlineQ This user is from outside of this forum
              quoidian@mastodon.online
              wrote last edited by
              #26

              @Seb1982 @quixoticgeek
              Disable the cooling system.

              mycotropic@beige.partyM 1 Reply Last reply
              0
              • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                Link Preview Image
                New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                The 40,000-acre project will run entirely off-grid using natural gas.

                favicon

                Tom's Hardware (www.tomshardware.com)

                carstenfranke@mastodon.socialC This user is from outside of this forum
                carstenfranke@mastodon.socialC This user is from outside of this forum
                carstenfranke@mastodon.social
                wrote last edited by
                #27

                @quixoticgeek and there is an even bigger one planned .. link in the article.
                I am really not sure where the money will be to pay for all this computing...

                Link Preview Image
                1 Reply Last reply
                0
                • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                  9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                  Link Preview Image
                  New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                  The 40,000-acre project will run entirely off-grid using natural gas.

                  favicon

                  Tom's Hardware (www.tomshardware.com)

                  phl@mastodon.socialP This user is from outside of this forum
                  phl@mastodon.socialP This user is from outside of this forum
                  phl@mastodon.social
                  wrote last edited by
                  #28

                  @quixoticgeek Just the thing we need in the middle of a climate crisis.

                  1 Reply Last reply
                  0
                  • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                    9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                    Link Preview Image
                    New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                    The 40,000-acre project will run entirely off-grid using natural gas.

                    favicon

                    Tom's Hardware (www.tomshardware.com)

                    marud@social.marud.frM This user is from outside of this forum
                    marud@social.marud.frM This user is from outside of this forum
                    marud@social.marud.fr
                    wrote last edited by
                    #29

                    @quixoticgeek this is so painful to read 😢

                    1 Reply Last reply
                    0
                    • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                      9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                      Link Preview Image
                      New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                      The 40,000-acre project will run entirely off-grid using natural gas.

                      favicon

                      Tom's Hardware (www.tomshardware.com)

                      ehproque@neopaquita.esE This user is from outside of this forum
                      ehproque@neopaquita.esE This user is from outside of this forum
                      ehproque@neopaquita.es
                      wrote last edited by
                      #30

                      @quixoticgeek how much water then? Where's it coming from?

                      quixoticgeek@social.v.stQ mycotropic@beige.partyM dougfir@m.ai6yr.orgD 3 Replies Last reply
                      0
                      • ehproque@neopaquita.esE ehproque@neopaquita.es

                        @quixoticgeek how much water then? Where's it coming from?

                        quixoticgeek@social.v.stQ This user is from outside of this forum
                        quixoticgeek@social.v.stQ This user is from outside of this forum
                        quixoticgeek@social.v.st
                        wrote last edited by
                        #31

                        @ehproque dunno. I'm scared of the answer.

                        cppguy@infosec.spaceC 1 Reply Last reply
                        0
                        • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                          9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                          Link Preview Image
                          New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                          The 40,000-acre project will run entirely off-grid using natural gas.

                          favicon

                          Tom's Hardware (www.tomshardware.com)

                          sassinake@mastodon.socialS This user is from outside of this forum
                          sassinake@mastodon.socialS This user is from outside of this forum
                          sassinake@mastodon.social
                          wrote last edited by
                          #32

                          @quixoticgeek

                          Now that the tech exists to generate fabulous amounts of energy, tech and energy oligarchs immediately found ways to waste it to keep it out of the peasants' reach.

                          1 Reply Last reply
                          0
                          • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                            9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                            Link Preview Image
                            New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                            The 40,000-acre project will run entirely off-grid using natural gas.

                            favicon

                            Tom's Hardware (www.tomshardware.com)

                            mighty_orbot@retro.pizzaM This user is from outside of this forum
                            mighty_orbot@retro.pizzaM This user is from outside of this forum
                            mighty_orbot@retro.pizza
                            wrote last edited by
                            #33

                            @quixoticgeek “2,000 permanent jobs in the county following construction”? Doing what, sweeping the halls?

                            mycotropic@beige.partyM 1 Reply Last reply
                            0
                            • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                              9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                              Link Preview Image
                              New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                              The 40,000-acre project will run entirely off-grid using natural gas.

                              favicon

                              Tom's Hardware (www.tomshardware.com)

                              evoscale@c.imE This user is from outside of this forum
                              evoscale@c.imE This user is from outside of this forum
                              evoscale@c.im
                              wrote last edited by
                              #34

                              @quixoticgeek At scale, such a powerful root infrastructure would require more than one source, like geothermal and wind, to justify such an amount. But placing a singular sourcing is an obvious liability with no backup/complimentary framework. It's like putting a large heavy water nuclear reactor in place, instead of smaller, overlapping modular Thorium, or Natrium reactors.

                              Simply just another #TechBros money-grab, at the taxpayer's expense.

                              1 Reply Last reply
                              0
                              • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                Based on an estimate of 500g CO2/kWh, the one facility would emit ~40MT of CO2 a year. If this one facility was a country, it would rank about 67th, just behind Bulgaria.

                                Concentrating this much energy use in a single location is going to change weather patterns. The environmental impact is just mind boggling.

                                The AI bubble can't burst soon enough.

                                Y This user is from outside of this forum
                                Y This user is from outside of this forum
                                ysotomayor@mastodon.social
                                wrote last edited by
                                #35

                                @quixoticgeek Utah is already at the brink of collapse due to large farms with little to no environmental management, extremely poor water management, and the ever increasing air pollution in the Wasatch Valley where most of the people live. Add to that the ultra conservative majority that have been brainwashed by politicians and the mormon church, and you got a massive environmental desaster in the next 20 years.

                                1 Reply Last reply
                                0
                                • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                  Based on an estimate of 500g CO2/kWh, the one facility would emit ~40MT of CO2 a year. If this one facility was a country, it would rank about 67th, just behind Bulgaria.

                                  Concentrating this much energy use in a single location is going to change weather patterns. The environmental impact is just mind boggling.

                                  The AI bubble can't burst soon enough.

                                  Y This user is from outside of this forum
                                  Y This user is from outside of this forum
                                  ysotomayor@mastodon.social
                                  wrote last edited by
                                  #36

                                  @quixoticgeek The best years of my life were spend in SLC, and I still have a lot of great friends living there. Shit like this make me worry a lot.

                                  1 Reply Last reply
                                  0
                                  • R relay@relay.mycrowd.ca shared this topic
                                  • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                    9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                                    Link Preview Image
                                    New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                                    The 40,000-acre project will run entirely off-grid using natural gas.

                                    favicon

                                    Tom's Hardware (www.tomshardware.com)

                                    ansible42@social.ridetrans.itA This user is from outside of this forum
                                    ansible42@social.ridetrans.itA This user is from outside of this forum
                                    ansible42@social.ridetrans.it
                                    wrote last edited by
                                    #37

                                    @quixoticgeek I honestly bet they run out of financing and never finish it.

                                    Data center scam has to die.

                                    1 Reply Last reply
                                    0
                                    • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                      9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                                      Link Preview Image
                                      New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                                      The 40,000-acre project will run entirely off-grid using natural gas.

                                      favicon

                                      Tom's Hardware (www.tomshardware.com)

                                      bluewaver22@genomic.socialB This user is from outside of this forum
                                      bluewaver22@genomic.socialB This user is from outside of this forum
                                      bluewaver22@genomic.social
                                      wrote last edited by
                                      #38

                                      @quixoticgeek we’ve become such a shithole country. These things are going to be disastrous.

                                      1 Reply Last reply
                                      0
                                      • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                        9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                                        Link Preview Image
                                        New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                                        The 40,000-acre project will run entirely off-grid using natural gas.

                                        favicon

                                        Tom's Hardware (www.tomshardware.com)

                                        remittancegirl@mstdn.socialR This user is from outside of this forum
                                        remittancegirl@mstdn.socialR This user is from outside of this forum
                                        remittancegirl@mstdn.social
                                        wrote last edited by
                                        #39

                                        @quixoticgeek And not a single panel of solar?

                                        And... when it fails, will they turn it into another detention centre for people they don't like?

                                        mycotropic@beige.partyM tubemeister@mstdn.socialT 2 Replies Last reply
                                        0
                                        • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                          9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                                          Link Preview Image
                                          New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                                          The 40,000-acre project will run entirely off-grid using natural gas.

                                          favicon

                                          Tom's Hardware (www.tomshardware.com)

                                          christo_459@mastodon.me.ukC This user is from outside of this forum
                                          christo_459@mastodon.me.ukC This user is from outside of this forum
                                          christo_459@mastodon.me.uk
                                          wrote last edited by
                                          #40

                                          @quixoticgeek
                                          We should ban all these huge data centres. We don't need AI

                                          1 Reply Last reply
                                          0
                                          Reply
                                          • Reply as topic
                                          Log in to reply
                                          • Oldest to Newest
                                          • Newest to Oldest
                                          • Most Votes


                                          • Login

                                          • Login or register to search.
                                          • First post
                                            Last post
                                          0
                                          • Categories
                                          • Recent
                                          • Tags
                                          • Popular
                                          • World
                                          • Users
                                          • Groups