Skip to content
  • Categories
  • Recent
  • Tags
  • Popular
  • World
  • Users
  • Groups
Skins
  • Light
  • Brite
  • Cerulean
  • Cosmo
  • Flatly
  • Journal
  • Litera
  • Lumen
  • Lux
  • Materia
  • Minty
  • Morph
  • Pulse
  • Sandstone
  • Simplex
  • Sketchy
  • Spacelab
  • United
  • Yeti
  • Zephyr
  • Dark
  • Cyborg
  • Darkly
  • Quartz
  • Slate
  • Solar
  • Superhero
  • Vapor

  • Default (Cyborg)
  • No Skin
Collapse
Brand Logo

CIRCLE WITH A DOT

  1. Home
  2. Uncategorized
  3. 9GW datacentre approved.

9GW datacentre approved.

Scheduled Pinned Locked Moved Uncategorized
109 Posts 68 Posters 0 Views
  • Oldest to Newest
  • Newest to Oldest
  • Most Votes
Reply
  • Reply as topic
Log in to reply
This topic has been deleted. Only users with topic management privileges can see it.
  • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

    9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

    Link Preview Image
    New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

    The 40,000-acre project will run entirely off-grid using natural gas.

    favicon

    Tom's Hardware (www.tomshardware.com)

    carstenfranke@mastodon.socialC This user is from outside of this forum
    carstenfranke@mastodon.socialC This user is from outside of this forum
    carstenfranke@mastodon.social
    wrote last edited by
    #27

    @quixoticgeek and there is an even bigger one planned .. link in the article.
    I am really not sure where the money will be to pay for all this computing...

    Link Preview Image
    1 Reply Last reply
    0
    • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

      9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

      Link Preview Image
      New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

      The 40,000-acre project will run entirely off-grid using natural gas.

      favicon

      Tom's Hardware (www.tomshardware.com)

      phl@mastodon.socialP This user is from outside of this forum
      phl@mastodon.socialP This user is from outside of this forum
      phl@mastodon.social
      wrote last edited by
      #28

      @quixoticgeek Just the thing we need in the middle of a climate crisis.

      1 Reply Last reply
      0
      • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

        9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

        Link Preview Image
        New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

        The 40,000-acre project will run entirely off-grid using natural gas.

        favicon

        Tom's Hardware (www.tomshardware.com)

        marud@social.marud.frM This user is from outside of this forum
        marud@social.marud.frM This user is from outside of this forum
        marud@social.marud.fr
        wrote last edited by
        #29

        @quixoticgeek this is so painful to read 😢

        1 Reply Last reply
        0
        • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

          9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

          Link Preview Image
          New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

          The 40,000-acre project will run entirely off-grid using natural gas.

          favicon

          Tom's Hardware (www.tomshardware.com)

          ehproque@neopaquita.esE This user is from outside of this forum
          ehproque@neopaquita.esE This user is from outside of this forum
          ehproque@neopaquita.es
          wrote last edited by
          #30

          @quixoticgeek how much water then? Where's it coming from?

          quixoticgeek@social.v.stQ mycotropic@beige.partyM dougfir@m.ai6yr.orgD 3 Replies Last reply
          0
          • ehproque@neopaquita.esE ehproque@neopaquita.es

            @quixoticgeek how much water then? Where's it coming from?

            quixoticgeek@social.v.stQ This user is from outside of this forum
            quixoticgeek@social.v.stQ This user is from outside of this forum
            quixoticgeek@social.v.st
            wrote last edited by
            #31

            @ehproque dunno. I'm scared of the answer.

            cppguy@infosec.spaceC 1 Reply Last reply
            0
            • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

              9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

              Link Preview Image
              New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

              The 40,000-acre project will run entirely off-grid using natural gas.

              favicon

              Tom's Hardware (www.tomshardware.com)

              sassinake@mastodon.socialS This user is from outside of this forum
              sassinake@mastodon.socialS This user is from outside of this forum
              sassinake@mastodon.social
              wrote last edited by
              #32

              @quixoticgeek

              Now that the tech exists to generate fabulous amounts of energy, tech and energy oligarchs immediately found ways to waste it to keep it out of the peasants' reach.

              1 Reply Last reply
              0
              • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                Link Preview Image
                New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                The 40,000-acre project will run entirely off-grid using natural gas.

                favicon

                Tom's Hardware (www.tomshardware.com)

                mighty_orbot@retro.pizzaM This user is from outside of this forum
                mighty_orbot@retro.pizzaM This user is from outside of this forum
                mighty_orbot@retro.pizza
                wrote last edited by
                #33

                @quixoticgeek “2,000 permanent jobs in the county following construction”? Doing what, sweeping the halls?

                mycotropic@beige.partyM 1 Reply Last reply
                0
                • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                  9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                  Link Preview Image
                  New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                  The 40,000-acre project will run entirely off-grid using natural gas.

                  favicon

                  Tom's Hardware (www.tomshardware.com)

                  evoscale@c.imE This user is from outside of this forum
                  evoscale@c.imE This user is from outside of this forum
                  evoscale@c.im
                  wrote last edited by
                  #34

                  @quixoticgeek At scale, such a powerful root infrastructure would require more than one source, like geothermal and wind, to justify such an amount. But placing a singular sourcing is an obvious liability with no backup/complimentary framework. It's like putting a large heavy water nuclear reactor in place, instead of smaller, overlapping modular Thorium, or Natrium reactors.

                  Simply just another #TechBros money-grab, at the taxpayer's expense.

                  1 Reply Last reply
                  0
                  • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                    Based on an estimate of 500g CO2/kWh, the one facility would emit ~40MT of CO2 a year. If this one facility was a country, it would rank about 67th, just behind Bulgaria.

                    Concentrating this much energy use in a single location is going to change weather patterns. The environmental impact is just mind boggling.

                    The AI bubble can't burst soon enough.

                    Y This user is from outside of this forum
                    Y This user is from outside of this forum
                    ysotomayor@mastodon.social
                    wrote last edited by
                    #35

                    @quixoticgeek Utah is already at the brink of collapse due to large farms with little to no environmental management, extremely poor water management, and the ever increasing air pollution in the Wasatch Valley where most of the people live. Add to that the ultra conservative majority that have been brainwashed by politicians and the mormon church, and you got a massive environmental desaster in the next 20 years.

                    1 Reply Last reply
                    0
                    • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                      Based on an estimate of 500g CO2/kWh, the one facility would emit ~40MT of CO2 a year. If this one facility was a country, it would rank about 67th, just behind Bulgaria.

                      Concentrating this much energy use in a single location is going to change weather patterns. The environmental impact is just mind boggling.

                      The AI bubble can't burst soon enough.

                      Y This user is from outside of this forum
                      Y This user is from outside of this forum
                      ysotomayor@mastodon.social
                      wrote last edited by
                      #36

                      @quixoticgeek The best years of my life were spend in SLC, and I still have a lot of great friends living there. Shit like this make me worry a lot.

                      1 Reply Last reply
                      0
                      • R relay@relay.mycrowd.ca shared this topic
                      • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                        9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                        Link Preview Image
                        New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                        The 40,000-acre project will run entirely off-grid using natural gas.

                        favicon

                        Tom's Hardware (www.tomshardware.com)

                        ansible42@social.ridetrans.itA This user is from outside of this forum
                        ansible42@social.ridetrans.itA This user is from outside of this forum
                        ansible42@social.ridetrans.it
                        wrote last edited by
                        #37

                        @quixoticgeek I honestly bet they run out of financing and never finish it.

                        Data center scam has to die.

                        1 Reply Last reply
                        0
                        • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                          9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                          Link Preview Image
                          New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                          The 40,000-acre project will run entirely off-grid using natural gas.

                          favicon

                          Tom's Hardware (www.tomshardware.com)

                          bluewaver22@genomic.socialB This user is from outside of this forum
                          bluewaver22@genomic.socialB This user is from outside of this forum
                          bluewaver22@genomic.social
                          wrote last edited by
                          #38

                          @quixoticgeek we’ve become such a shithole country. These things are going to be disastrous.

                          1 Reply Last reply
                          0
                          • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                            9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                            Link Preview Image
                            New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                            The 40,000-acre project will run entirely off-grid using natural gas.

                            favicon

                            Tom's Hardware (www.tomshardware.com)

                            remittancegirl@mstdn.socialR This user is from outside of this forum
                            remittancegirl@mstdn.socialR This user is from outside of this forum
                            remittancegirl@mstdn.social
                            wrote last edited by
                            #39

                            @quixoticgeek And not a single panel of solar?

                            And... when it fails, will they turn it into another detention centre for people they don't like?

                            mycotropic@beige.partyM tubemeister@mstdn.socialT 2 Replies Last reply
                            0
                            • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                              9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                              Link Preview Image
                              New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                              The 40,000-acre project will run entirely off-grid using natural gas.

                              favicon

                              Tom's Hardware (www.tomshardware.com)

                              christo_459@mastodon.me.ukC This user is from outside of this forum
                              christo_459@mastodon.me.ukC This user is from outside of this forum
                              christo_459@mastodon.me.uk
                              wrote last edited by
                              #40

                              @quixoticgeek
                              We should ban all these huge data centres. We don't need AI

                              1 Reply Last reply
                              0
                              • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                                Link Preview Image
                                New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                                The 40,000-acre project will run entirely off-grid using natural gas.

                                favicon

                                Tom's Hardware (www.tomshardware.com)

                                catwoman69y2k@meow.socialC This user is from outside of this forum
                                catwoman69y2k@meow.socialC This user is from outside of this forum
                                catwoman69y2k@meow.social
                                wrote last edited by
                                #41

                                @quixoticgeek ...and it will be the people of Utah who will pay the bill (higher electricity bills, issues with water supply and pressure, etc...)

                                1 Reply Last reply
                                0
                                • quoidian@mastodon.onlineQ quoidian@mastodon.online

                                  @Seb1982 @quixoticgeek
                                  Disable the cooling system.

                                  mycotropic@beige.partyM This user is from outside of this forum
                                  mycotropic@beige.partyM This user is from outside of this forum
                                  mycotropic@beige.party
                                  wrote last edited by
                                  #42

                                  @quoidian @Seb1982 @quixoticgeek

                                  #Zodiac was a good book.

                                  1 Reply Last reply
                                  0
                                  • ehproque@neopaquita.esE ehproque@neopaquita.es

                                    @quixoticgeek how much water then? Where's it coming from?

                                    mycotropic@beige.partyM This user is from outside of this forum
                                    mycotropic@beige.partyM This user is from outside of this forum
                                    mycotropic@beige.party
                                    wrote last edited by
                                    #43

                                    @ehproque @quixoticgeek

                                    See the Colorado River is filled up with water from snow melt that's is eternal, neverending and limitless so.......

                                    ehproque@neopaquita.esE 1 Reply Last reply
                                    0
                                    • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                      9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                                      Link Preview Image
                                      New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                                      The 40,000-acre project will run entirely off-grid using natural gas.

                                      favicon

                                      Tom's Hardware (www.tomshardware.com)

                                      mugsysrapsheet@mastodon.socialM This user is from outside of this forum
                                      mugsysrapsheet@mastodon.socialM This user is from outside of this forum
                                      mugsysrapsheet@mastodon.social
                                      wrote last edited by
                                      #44

                                      @quixoticgeek
                                      Countries need to require all #DataCenters to generate their own (#green) electricity (and only use water-free cooling.)

                                      1 Reply Last reply
                                      0
                                      • mighty_orbot@retro.pizzaM mighty_orbot@retro.pizza

                                        @quixoticgeek “2,000 permanent jobs in the county following construction”? Doing what, sweeping the halls?

                                        mycotropic@beige.partyM This user is from outside of this forum
                                        mycotropic@beige.partyM This user is from outside of this forum
                                        mycotropic@beige.party
                                        wrote last edited by
                                        #45

                                        @mighty_orbot @quixoticgeek

                                        Licking the wire harnesses clean!

                                        1 Reply Last reply
                                        0
                                        • remittancegirl@mstdn.socialR remittancegirl@mstdn.social

                                          @quixoticgeek And not a single panel of solar?

                                          And... when it fails, will they turn it into another detention centre for people they don't like?

                                          mycotropic@beige.partyM This user is from outside of this forum
                                          mycotropic@beige.partyM This user is from outside of this forum
                                          mycotropic@beige.party
                                          wrote last edited by
                                          #46

                                          @Remittancegirl @quixoticgeek

                                          GPUs are going to be used for paving roads!

                                          1 Reply Last reply
                                          0
                                          Reply
                                          • Reply as topic
                                          Log in to reply
                                          • Oldest to Newest
                                          • Newest to Oldest
                                          • Most Votes


                                          • Login

                                          • Login or register to search.
                                          • First post
                                            Last post
                                          0
                                          • Categories
                                          • Recent
                                          • Tags
                                          • Popular
                                          • World
                                          • Users
                                          • Groups