Skip to content
  • Categories
  • Recent
  • Tags
  • Popular
  • World
  • Users
  • Groups
Skins
  • Light
  • Brite
  • Cerulean
  • Cosmo
  • Flatly
  • Journal
  • Litera
  • Lumen
  • Lux
  • Materia
  • Minty
  • Morph
  • Pulse
  • Sandstone
  • Simplex
  • Sketchy
  • Spacelab
  • United
  • Yeti
  • Zephyr
  • Dark
  • Cyborg
  • Darkly
  • Quartz
  • Slate
  • Solar
  • Superhero
  • Vapor

  • Default (Cyborg)
  • No Skin
Collapse
Brand Logo

CIRCLE WITH A DOT

  1. Home
  2. Uncategorized
  3. 9GW datacentre approved.

9GW datacentre approved.

Scheduled Pinned Locked Moved Uncategorized
109 Posts 68 Posters 0 Views
  • Oldest to Newest
  • Newest to Oldest
  • Most Votes
Reply
  • Reply as topic
Log in to reply
This topic has been deleted. Only users with topic management privileges can see it.
  • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

    9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

    Link Preview Image
    New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

    The 40,000-acre project will run entirely off-grid using natural gas.

    favicon

    Tom's Hardware (www.tomshardware.com)

    marud@social.marud.frM This user is from outside of this forum
    marud@social.marud.frM This user is from outside of this forum
    marud@social.marud.fr
    wrote last edited by
    #29

    @quixoticgeek this is so painful to read 😢

    1 Reply Last reply
    0
    • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

      9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

      Link Preview Image
      New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

      The 40,000-acre project will run entirely off-grid using natural gas.

      favicon

      Tom's Hardware (www.tomshardware.com)

      ehproque@neopaquita.esE This user is from outside of this forum
      ehproque@neopaquita.esE This user is from outside of this forum
      ehproque@neopaquita.es
      wrote last edited by
      #30

      @quixoticgeek how much water then? Where's it coming from?

      quixoticgeek@social.v.stQ mycotropic@beige.partyM dougfir@m.ai6yr.orgD 3 Replies Last reply
      0
      • ehproque@neopaquita.esE ehproque@neopaquita.es

        @quixoticgeek how much water then? Where's it coming from?

        quixoticgeek@social.v.stQ This user is from outside of this forum
        quixoticgeek@social.v.stQ This user is from outside of this forum
        quixoticgeek@social.v.st
        wrote last edited by
        #31

        @ehproque dunno. I'm scared of the answer.

        cppguy@infosec.spaceC 1 Reply Last reply
        0
        • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

          9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

          Link Preview Image
          New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

          The 40,000-acre project will run entirely off-grid using natural gas.

          favicon

          Tom's Hardware (www.tomshardware.com)

          sassinake@mastodon.socialS This user is from outside of this forum
          sassinake@mastodon.socialS This user is from outside of this forum
          sassinake@mastodon.social
          wrote last edited by
          #32

          @quixoticgeek

          Now that the tech exists to generate fabulous amounts of energy, tech and energy oligarchs immediately found ways to waste it to keep it out of the peasants' reach.

          1 Reply Last reply
          0
          • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

            9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

            Link Preview Image
            New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

            The 40,000-acre project will run entirely off-grid using natural gas.

            favicon

            Tom's Hardware (www.tomshardware.com)

            mighty_orbot@retro.pizzaM This user is from outside of this forum
            mighty_orbot@retro.pizzaM This user is from outside of this forum
            mighty_orbot@retro.pizza
            wrote last edited by
            #33

            @quixoticgeek “2,000 permanent jobs in the county following construction”? Doing what, sweeping the halls?

            mycotropic@beige.partyM 1 Reply Last reply
            0
            • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

              9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

              Link Preview Image
              New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

              The 40,000-acre project will run entirely off-grid using natural gas.

              favicon

              Tom's Hardware (www.tomshardware.com)

              evoscale@c.imE This user is from outside of this forum
              evoscale@c.imE This user is from outside of this forum
              evoscale@c.im
              wrote last edited by
              #34

              @quixoticgeek At scale, such a powerful root infrastructure would require more than one source, like geothermal and wind, to justify such an amount. But placing a singular sourcing is an obvious liability with no backup/complimentary framework. It's like putting a large heavy water nuclear reactor in place, instead of smaller, overlapping modular Thorium, or Natrium reactors.

              Simply just another #TechBros money-grab, at the taxpayer's expense.

              1 Reply Last reply
              0
              • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                Based on an estimate of 500g CO2/kWh, the one facility would emit ~40MT of CO2 a year. If this one facility was a country, it would rank about 67th, just behind Bulgaria.

                Concentrating this much energy use in a single location is going to change weather patterns. The environmental impact is just mind boggling.

                The AI bubble can't burst soon enough.

                Y This user is from outside of this forum
                Y This user is from outside of this forum
                ysotomayor@mastodon.social
                wrote last edited by
                #35

                @quixoticgeek Utah is already at the brink of collapse due to large farms with little to no environmental management, extremely poor water management, and the ever increasing air pollution in the Wasatch Valley where most of the people live. Add to that the ultra conservative majority that have been brainwashed by politicians and the mormon church, and you got a massive environmental desaster in the next 20 years.

                1 Reply Last reply
                0
                • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                  Based on an estimate of 500g CO2/kWh, the one facility would emit ~40MT of CO2 a year. If this one facility was a country, it would rank about 67th, just behind Bulgaria.

                  Concentrating this much energy use in a single location is going to change weather patterns. The environmental impact is just mind boggling.

                  The AI bubble can't burst soon enough.

                  Y This user is from outside of this forum
                  Y This user is from outside of this forum
                  ysotomayor@mastodon.social
                  wrote last edited by
                  #36

                  @quixoticgeek The best years of my life were spend in SLC, and I still have a lot of great friends living there. Shit like this make me worry a lot.

                  1 Reply Last reply
                  0
                  • R relay@relay.mycrowd.ca shared this topic
                  • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                    9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                    Link Preview Image
                    New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                    The 40,000-acre project will run entirely off-grid using natural gas.

                    favicon

                    Tom's Hardware (www.tomshardware.com)

                    ansible42@social.ridetrans.itA This user is from outside of this forum
                    ansible42@social.ridetrans.itA This user is from outside of this forum
                    ansible42@social.ridetrans.it
                    wrote last edited by
                    #37

                    @quixoticgeek I honestly bet they run out of financing and never finish it.

                    Data center scam has to die.

                    1 Reply Last reply
                    0
                    • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                      9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                      Link Preview Image
                      New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                      The 40,000-acre project will run entirely off-grid using natural gas.

                      favicon

                      Tom's Hardware (www.tomshardware.com)

                      bluewaver22@genomic.socialB This user is from outside of this forum
                      bluewaver22@genomic.socialB This user is from outside of this forum
                      bluewaver22@genomic.social
                      wrote last edited by
                      #38

                      @quixoticgeek we’ve become such a shithole country. These things are going to be disastrous.

                      1 Reply Last reply
                      0
                      • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                        9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                        Link Preview Image
                        New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                        The 40,000-acre project will run entirely off-grid using natural gas.

                        favicon

                        Tom's Hardware (www.tomshardware.com)

                        remittancegirl@mstdn.socialR This user is from outside of this forum
                        remittancegirl@mstdn.socialR This user is from outside of this forum
                        remittancegirl@mstdn.social
                        wrote last edited by
                        #39

                        @quixoticgeek And not a single panel of solar?

                        And... when it fails, will they turn it into another detention centre for people they don't like?

                        mycotropic@beige.partyM tubemeister@mstdn.socialT 2 Replies Last reply
                        0
                        • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                          9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                          Link Preview Image
                          New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                          The 40,000-acre project will run entirely off-grid using natural gas.

                          favicon

                          Tom's Hardware (www.tomshardware.com)

                          christo_459@mastodon.me.ukC This user is from outside of this forum
                          christo_459@mastodon.me.ukC This user is from outside of this forum
                          christo_459@mastodon.me.uk
                          wrote last edited by
                          #40

                          @quixoticgeek
                          We should ban all these huge data centres. We don't need AI

                          1 Reply Last reply
                          0
                          • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                            9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                            Link Preview Image
                            New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                            The 40,000-acre project will run entirely off-grid using natural gas.

                            favicon

                            Tom's Hardware (www.tomshardware.com)

                            catwoman69y2k@meow.socialC This user is from outside of this forum
                            catwoman69y2k@meow.socialC This user is from outside of this forum
                            catwoman69y2k@meow.social
                            wrote last edited by
                            #41

                            @quixoticgeek ...and it will be the people of Utah who will pay the bill (higher electricity bills, issues with water supply and pressure, etc...)

                            1 Reply Last reply
                            0
                            • quoidian@mastodon.onlineQ quoidian@mastodon.online

                              @Seb1982 @quixoticgeek
                              Disable the cooling system.

                              mycotropic@beige.partyM This user is from outside of this forum
                              mycotropic@beige.partyM This user is from outside of this forum
                              mycotropic@beige.party
                              wrote last edited by
                              #42

                              @quoidian @Seb1982 @quixoticgeek

                              #Zodiac was a good book.

                              1 Reply Last reply
                              0
                              • ehproque@neopaquita.esE ehproque@neopaquita.es

                                @quixoticgeek how much water then? Where's it coming from?

                                mycotropic@beige.partyM This user is from outside of this forum
                                mycotropic@beige.partyM This user is from outside of this forum
                                mycotropic@beige.party
                                wrote last edited by
                                #43

                                @ehproque @quixoticgeek

                                See the Colorado River is filled up with water from snow melt that's is eternal, neverending and limitless so.......

                                ehproque@neopaquita.esE 1 Reply Last reply
                                0
                                • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                  9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                                  Link Preview Image
                                  New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                                  The 40,000-acre project will run entirely off-grid using natural gas.

                                  favicon

                                  Tom's Hardware (www.tomshardware.com)

                                  mugsysrapsheet@mastodon.socialM This user is from outside of this forum
                                  mugsysrapsheet@mastodon.socialM This user is from outside of this forum
                                  mugsysrapsheet@mastodon.social
                                  wrote last edited by
                                  #44

                                  @quixoticgeek
                                  Countries need to require all #DataCenters to generate their own (#green) electricity (and only use water-free cooling.)

                                  1 Reply Last reply
                                  0
                                  • mighty_orbot@retro.pizzaM mighty_orbot@retro.pizza

                                    @quixoticgeek “2,000 permanent jobs in the county following construction”? Doing what, sweeping the halls?

                                    mycotropic@beige.partyM This user is from outside of this forum
                                    mycotropic@beige.partyM This user is from outside of this forum
                                    mycotropic@beige.party
                                    wrote last edited by
                                    #45

                                    @mighty_orbot @quixoticgeek

                                    Licking the wire harnesses clean!

                                    1 Reply Last reply
                                    0
                                    • remittancegirl@mstdn.socialR remittancegirl@mstdn.social

                                      @quixoticgeek And not a single panel of solar?

                                      And... when it fails, will they turn it into another detention centre for people they don't like?

                                      mycotropic@beige.partyM This user is from outside of this forum
                                      mycotropic@beige.partyM This user is from outside of this forum
                                      mycotropic@beige.party
                                      wrote last edited by
                                      #46

                                      @Remittancegirl @quixoticgeek

                                      GPUs are going to be used for paving roads!

                                      1 Reply Last reply
                                      0
                                      • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                        9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                                        Link Preview Image
                                        New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                                        The 40,000-acre project will run entirely off-grid using natural gas.

                                        favicon

                                        Tom's Hardware (www.tomshardware.com)

                                        bouriquet@mastodon.socialB This user is from outside of this forum
                                        bouriquet@mastodon.socialB This user is from outside of this forum
                                        bouriquet@mastodon.social
                                        wrote last edited by
                                        #47

                                        @quixoticgeek That means 6GW of heat get dissipated into the atmosphere one way or another. Energy is neither created nor destroyed, just released into the atmosphere from where it was bound up as natural gas.
                                        What’s the impact of 6GW of additional heat on the climate?

                                        iwein@mas.toI 1 Reply Last reply
                                        0
                                        • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                          9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                                          Link Preview Image
                                          New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                                          The 40,000-acre project will run entirely off-grid using natural gas.

                                          favicon

                                          Tom's Hardware (www.tomshardware.com)

                                          zompetto@mastodon.artZ This user is from outside of this forum
                                          zompetto@mastodon.artZ This user is from outside of this forum
                                          zompetto@mastodon.art
                                          wrote last edited by
                                          #48

                                          @quixoticgeek as Ed Zitron loves to remind us, _approved_ does not mean it will ever get built.

                                          This will be fought tooth and nail at every inch of the process.

                                          - YouTube

                                          Auf YouTube findest du die angesagtesten Videos und Tracks. Außerdem kannst du eigene Inhalte hochladen und mit Freunden oder gleich der ganzen Welt teilen.

                                          favicon

                                          (www.youtube.com)

                                          Edit: fixed the name! Added a link.

                                          1 Reply Last reply
                                          0
                                          Reply
                                          • Reply as topic
                                          Log in to reply
                                          • Oldest to Newest
                                          • Newest to Oldest
                                          • Most Votes


                                          • Login

                                          • Login or register to search.
                                          • First post
                                            Last post
                                          0
                                          • Categories
                                          • Recent
                                          • Tags
                                          • Popular
                                          • World
                                          • Users
                                          • Groups