Skip to content
  • Categories
  • Recent
  • Tags
  • Popular
  • World
  • Users
  • Groups
Skins
  • Light
  • Brite
  • Cerulean
  • Cosmo
  • Flatly
  • Journal
  • Litera
  • Lumen
  • Lux
  • Materia
  • Minty
  • Morph
  • Pulse
  • Sandstone
  • Simplex
  • Sketchy
  • Spacelab
  • United
  • Yeti
  • Zephyr
  • Dark
  • Cyborg
  • Darkly
  • Quartz
  • Slate
  • Solar
  • Superhero
  • Vapor

  • Default (Cyborg)
  • No Skin
Collapse
Brand Logo

CIRCLE WITH A DOT

  1. Home
  2. Uncategorized
  3. 9GW datacentre approved.

9GW datacentre approved.

Scheduled Pinned Locked Moved Uncategorized
109 Posts 68 Posters 0 Views
  • Oldest to Newest
  • Newest to Oldest
  • Most Votes
Reply
  • Reply as topic
Log in to reply
This topic has been deleted. Only users with topic management privileges can see it.
  • mindpersephone@spookygirl.booM mindpersephone@spookygirl.boo

    @quixoticgeek that's ~45 CERNs?! WTF?

    Forty five of the thing they joked might be able to create a black hole and end the world, in a single site?

    ~ one Saturn 5 F1 main engine burning constantly for the life time of the site not just a few hundred seconds

    This is a stupid amount of energy use.

    mindpersephone@spookygirl.booM This user is from outside of this forum
    mindpersephone@spookygirl.booM This user is from outside of this forum
    mindpersephone@spookygirl.boo
    wrote last edited by
    #19

    @quixoticgeek hang on the thing runs on gas, so an f1 engine gives a vague idea of how much gas its going to need. ~A Saturn five first stage fuel tank every fifteen minutes (rounding to a nice round number)

    If you've ever seen a person standing next to a Saturn five you have an idea how utterly absurd an amount of fuel that is.

    With out the pipeline that places shuts down. And we thought the back hoe through the fiber link was a bad problem.

    profpatsch@mastodon.xyzP 1 Reply Last reply
    0
    • ferricoxide@blahaj.zoneF ferricoxide@blahaj.zone

      @quixoticgeek@v.st

      Sounds not unlike what's going on in the US.

      Datacenter builders love deserts:

      * Land is cheap

      * Large, contiguous chunks of land are easier to come by

      * Fewer neighbors to contend with

      * Generally less stuff that needs to be bulldozed to build the datacenter, itself, and the infrastructure that feeds it.

      marjolica@social.linux.pizzaM This user is from outside of this forum
      marjolica@social.linux.pizzaM This user is from outside of this forum
      marjolica@social.linux.pizza
      wrote last edited by
      #20

      @ferricoxide @quixoticgeek "Datacenter builders love deserts"

      ..and deserts usually have such a plentiful supply of water for cooling.

      Presumably they will take the water from Lake Powell?

      Link Preview Image
      The costs of surging water into drought-depleted Lake Powell will be widespread

      Lake Powell is at just 23% capacity and approaching the point where water won't be able to flow into its hydroelectric turbines without air causing damage.

      favicon

      KUER (www.kuer.org)

      1 Reply Last reply
      0
      • syklemil@snabelen.noS syklemil@snabelen.no

        @quixoticgeek
        Solar & wind are still cheaper than gas though, so still a weird choice
        @CppGuy

        cppguy@infosec.spaceC This user is from outside of this forum
        cppguy@infosec.spaceC This user is from outside of this forum
        cppguy@infosec.space
        wrote last edited by
        #21

        @syklemil @quixoticgeek

        They're building the thing in a desert, i.e. an expanse of unused space. If they had to build this monstrosity at all, they could have used some of that space for renewable energy generation.

        1 Reply Last reply
        0
        • syklemil@snabelen.noS syklemil@snabelen.no

          @quixoticgeek
          Solar & wind are still cheaper than gas though, so still a weird choice
          @CppGuy

          brokar@mastodon.socialB This user is from outside of this forum
          brokar@mastodon.socialB This user is from outside of this forum
          brokar@mastodon.social
          wrote last edited by
          #22

          @syklemil @quixoticgeek @CppGuy

          They will be building power plants for that because no state has 9GW power lying around or spare, not even talking about the cables and infrastructure you'd need to even get the energy there.
          And since this is a desert, i assume there isn't much water around for cooling.
          Also, i can only guess the number of backup generators they'd need to secure operation. Gas powered of course. And are they talking about carbon neutrality? Being the good greenwashing company?

          1 Reply Last reply
          0
          • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

            9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

            Link Preview Image
            New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

            The 40,000-acre project will run entirely off-grid using natural gas.

            favicon

            Tom's Hardware (www.tomshardware.com)

            artemis@climatejustice.socialA This user is from outside of this forum
            artemis@climatejustice.socialA This user is from outside of this forum
            artemis@climatejustice.social
            wrote last edited by
            #23

            @quixoticgeek and isn't 'natural gas' just the most newspeak name for a fossil fuel.

            quixoticgeek@social.v.stQ 1 Reply Last reply
            0
            • artemis@climatejustice.socialA artemis@climatejustice.social

              @quixoticgeek and isn't 'natural gas' just the most newspeak name for a fossil fuel.

              quixoticgeek@social.v.stQ This user is from outside of this forum
              quixoticgeek@social.v.stQ This user is from outside of this forum
              quixoticgeek@social.v.st
              wrote last edited by
              #24

              @artemis ok. So natural gas is because for many years the gas network in most places was derived from coal gas, or town gas, whereby coal was heated up to produce coke, which was used in things like steel production, and the gas was then piped locally to homes and businesses. Natural gas as a fuel source is relatively recent. In the UK we're talking later half of the 20th century.

              artemis@climatejustice.socialA 1 Reply Last reply
              0
              • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                Link Preview Image
                New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                The 40,000-acre project will run entirely off-grid using natural gas.

                favicon

                Tom's Hardware (www.tomshardware.com)

                shivviness@beige.partyS This user is from outside of this forum
                shivviness@beige.partyS This user is from outside of this forum
                shivviness@beige.party
                wrote last edited by
                #25

                @quixoticgeek

                People need to understand that these datacentres are not just for generating fun pics, they're intended to replace workers en masse, and they're going to ultimately replaces wages.

                And there's no way Universal Basic Income will be even considered, and notwithstanding the BS that Musk has been spouting recently in favour of UBI.

                pst@tldr.nettime.orgP 1 Reply Last reply
                0
                • seb1982@norden.socialS seb1982@norden.social

                  @quixoticgeek I would like to bring in a completely different aspect:
                  As the data centre runs entirely on natural gas, sabotaging the whole facility seems to be quite an easy thing to do.

                  quoidian@mastodon.onlineQ This user is from outside of this forum
                  quoidian@mastodon.onlineQ This user is from outside of this forum
                  quoidian@mastodon.online
                  wrote last edited by
                  #26

                  @Seb1982 @quixoticgeek
                  Disable the cooling system.

                  mycotropic@beige.partyM 1 Reply Last reply
                  0
                  • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                    9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                    Link Preview Image
                    New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                    The 40,000-acre project will run entirely off-grid using natural gas.

                    favicon

                    Tom's Hardware (www.tomshardware.com)

                    carstenfranke@mastodon.socialC This user is from outside of this forum
                    carstenfranke@mastodon.socialC This user is from outside of this forum
                    carstenfranke@mastodon.social
                    wrote last edited by
                    #27

                    @quixoticgeek and there is an even bigger one planned .. link in the article.
                    I am really not sure where the money will be to pay for all this computing...

                    Link Preview Image
                    1 Reply Last reply
                    0
                    • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                      9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                      Link Preview Image
                      New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                      The 40,000-acre project will run entirely off-grid using natural gas.

                      favicon

                      Tom's Hardware (www.tomshardware.com)

                      phl@mastodon.socialP This user is from outside of this forum
                      phl@mastodon.socialP This user is from outside of this forum
                      phl@mastodon.social
                      wrote last edited by
                      #28

                      @quixoticgeek Just the thing we need in the middle of a climate crisis.

                      1 Reply Last reply
                      0
                      • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                        9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                        Link Preview Image
                        New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                        The 40,000-acre project will run entirely off-grid using natural gas.

                        favicon

                        Tom's Hardware (www.tomshardware.com)

                        marud@social.marud.frM This user is from outside of this forum
                        marud@social.marud.frM This user is from outside of this forum
                        marud@social.marud.fr
                        wrote last edited by
                        #29

                        @quixoticgeek this is so painful to read 😢

                        1 Reply Last reply
                        0
                        • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                          9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                          Link Preview Image
                          New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                          The 40,000-acre project will run entirely off-grid using natural gas.

                          favicon

                          Tom's Hardware (www.tomshardware.com)

                          ehproque@neopaquita.esE This user is from outside of this forum
                          ehproque@neopaquita.esE This user is from outside of this forum
                          ehproque@neopaquita.es
                          wrote last edited by
                          #30

                          @quixoticgeek how much water then? Where's it coming from?

                          quixoticgeek@social.v.stQ mycotropic@beige.partyM dougfir@m.ai6yr.orgD 3 Replies Last reply
                          0
                          • ehproque@neopaquita.esE ehproque@neopaquita.es

                            @quixoticgeek how much water then? Where's it coming from?

                            quixoticgeek@social.v.stQ This user is from outside of this forum
                            quixoticgeek@social.v.stQ This user is from outside of this forum
                            quixoticgeek@social.v.st
                            wrote last edited by
                            #31

                            @ehproque dunno. I'm scared of the answer.

                            cppguy@infosec.spaceC 1 Reply Last reply
                            0
                            • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                              9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                              Link Preview Image
                              New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                              The 40,000-acre project will run entirely off-grid using natural gas.

                              favicon

                              Tom's Hardware (www.tomshardware.com)

                              sassinake@mastodon.socialS This user is from outside of this forum
                              sassinake@mastodon.socialS This user is from outside of this forum
                              sassinake@mastodon.social
                              wrote last edited by
                              #32

                              @quixoticgeek

                              Now that the tech exists to generate fabulous amounts of energy, tech and energy oligarchs immediately found ways to waste it to keep it out of the peasants' reach.

                              1 Reply Last reply
                              0
                              • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                                Link Preview Image
                                New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                                The 40,000-acre project will run entirely off-grid using natural gas.

                                favicon

                                Tom's Hardware (www.tomshardware.com)

                                mighty_orbot@retro.pizzaM This user is from outside of this forum
                                mighty_orbot@retro.pizzaM This user is from outside of this forum
                                mighty_orbot@retro.pizza
                                wrote last edited by
                                #33

                                @quixoticgeek “2,000 permanent jobs in the county following construction”? Doing what, sweeping the halls?

                                mycotropic@beige.partyM 1 Reply Last reply
                                0
                                • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                  9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                                  Link Preview Image
                                  New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                                  The 40,000-acre project will run entirely off-grid using natural gas.

                                  favicon

                                  Tom's Hardware (www.tomshardware.com)

                                  evoscale@c.imE This user is from outside of this forum
                                  evoscale@c.imE This user is from outside of this forum
                                  evoscale@c.im
                                  wrote last edited by
                                  #34

                                  @quixoticgeek At scale, such a powerful root infrastructure would require more than one source, like geothermal and wind, to justify such an amount. But placing a singular sourcing is an obvious liability with no backup/complimentary framework. It's like putting a large heavy water nuclear reactor in place, instead of smaller, overlapping modular Thorium, or Natrium reactors.

                                  Simply just another #TechBros money-grab, at the taxpayer's expense.

                                  1 Reply Last reply
                                  0
                                  • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                    Based on an estimate of 500g CO2/kWh, the one facility would emit ~40MT of CO2 a year. If this one facility was a country, it would rank about 67th, just behind Bulgaria.

                                    Concentrating this much energy use in a single location is going to change weather patterns. The environmental impact is just mind boggling.

                                    The AI bubble can't burst soon enough.

                                    Y This user is from outside of this forum
                                    Y This user is from outside of this forum
                                    ysotomayor@mastodon.social
                                    wrote last edited by
                                    #35

                                    @quixoticgeek Utah is already at the brink of collapse due to large farms with little to no environmental management, extremely poor water management, and the ever increasing air pollution in the Wasatch Valley where most of the people live. Add to that the ultra conservative majority that have been brainwashed by politicians and the mormon church, and you got a massive environmental desaster in the next 20 years.

                                    1 Reply Last reply
                                    0
                                    • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                      Based on an estimate of 500g CO2/kWh, the one facility would emit ~40MT of CO2 a year. If this one facility was a country, it would rank about 67th, just behind Bulgaria.

                                      Concentrating this much energy use in a single location is going to change weather patterns. The environmental impact is just mind boggling.

                                      The AI bubble can't burst soon enough.

                                      Y This user is from outside of this forum
                                      Y This user is from outside of this forum
                                      ysotomayor@mastodon.social
                                      wrote last edited by
                                      #36

                                      @quixoticgeek The best years of my life were spend in SLC, and I still have a lot of great friends living there. Shit like this make me worry a lot.

                                      1 Reply Last reply
                                      0
                                      • R relay@relay.mycrowd.ca shared this topic
                                      • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                        9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                                        Link Preview Image
                                        New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                                        The 40,000-acre project will run entirely off-grid using natural gas.

                                        favicon

                                        Tom's Hardware (www.tomshardware.com)

                                        ansible42@social.ridetrans.itA This user is from outside of this forum
                                        ansible42@social.ridetrans.itA This user is from outside of this forum
                                        ansible42@social.ridetrans.it
                                        wrote last edited by
                                        #37

                                        @quixoticgeek I honestly bet they run out of financing and never finish it.

                                        Data center scam has to die.

                                        1 Reply Last reply
                                        0
                                        • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                          9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                                          Link Preview Image
                                          New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                                          The 40,000-acre project will run entirely off-grid using natural gas.

                                          favicon

                                          Tom's Hardware (www.tomshardware.com)

                                          bluewaver22@genomic.socialB This user is from outside of this forum
                                          bluewaver22@genomic.socialB This user is from outside of this forum
                                          bluewaver22@genomic.social
                                          wrote last edited by
                                          #38

                                          @quixoticgeek we’ve become such a shithole country. These things are going to be disastrous.

                                          1 Reply Last reply
                                          0
                                          Reply
                                          • Reply as topic
                                          Log in to reply
                                          • Oldest to Newest
                                          • Newest to Oldest
                                          • Most Votes


                                          • Login

                                          • Login or register to search.
                                          • First post
                                            Last post
                                          0
                                          • Categories
                                          • Recent
                                          • Tags
                                          • Popular
                                          • World
                                          • Users
                                          • Groups