Skip to content
  • Categories
  • Recent
  • Tags
  • Popular
  • World
  • Users
  • Groups
Skins
  • Light
  • Brite
  • Cerulean
  • Cosmo
  • Flatly
  • Journal
  • Litera
  • Lumen
  • Lux
  • Materia
  • Minty
  • Morph
  • Pulse
  • Sandstone
  • Simplex
  • Sketchy
  • Spacelab
  • United
  • Yeti
  • Zephyr
  • Dark
  • Cyborg
  • Darkly
  • Quartz
  • Slate
  • Solar
  • Superhero
  • Vapor

  • Default (Cyborg)
  • No Skin
Collapse
Brand Logo

CIRCLE WITH A DOT

  1. Home
  2. Uncategorized
  3. 9GW datacentre approved.

9GW datacentre approved.

Scheduled Pinned Locked Moved Uncategorized
109 Posts 68 Posters 0 Views
  • Oldest to Newest
  • Newest to Oldest
  • Most Votes
Reply
  • Reply as topic
Log in to reply
This topic has been deleted. Only users with topic management privileges can see it.
  • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

    9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

    Link Preview Image
    New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

    The 40,000-acre project will run entirely off-grid using natural gas.

    favicon

    Tom's Hardware (www.tomshardware.com)

    shivviness@beige.partyS This user is from outside of this forum
    shivviness@beige.partyS This user is from outside of this forum
    shivviness@beige.party
    wrote last edited by
    #25

    @quixoticgeek

    People need to understand that these datacentres are not just for generating fun pics, they're intended to replace workers en masse, and they're going to ultimately replaces wages.

    And there's no way Universal Basic Income will be even considered, and notwithstanding the BS that Musk has been spouting recently in favour of UBI.

    pst@tldr.nettime.orgP 1 Reply Last reply
    0
    • seb1982@norden.socialS seb1982@norden.social

      @quixoticgeek I would like to bring in a completely different aspect:
      As the data centre runs entirely on natural gas, sabotaging the whole facility seems to be quite an easy thing to do.

      quoidian@mastodon.onlineQ This user is from outside of this forum
      quoidian@mastodon.onlineQ This user is from outside of this forum
      quoidian@mastodon.online
      wrote last edited by
      #26

      @Seb1982 @quixoticgeek
      Disable the cooling system.

      mycotropic@beige.partyM 1 Reply Last reply
      0
      • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

        9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

        Link Preview Image
        New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

        The 40,000-acre project will run entirely off-grid using natural gas.

        favicon

        Tom's Hardware (www.tomshardware.com)

        carstenfranke@mastodon.socialC This user is from outside of this forum
        carstenfranke@mastodon.socialC This user is from outside of this forum
        carstenfranke@mastodon.social
        wrote last edited by
        #27

        @quixoticgeek and there is an even bigger one planned .. link in the article.
        I am really not sure where the money will be to pay for all this computing...

        Link Preview Image
        1 Reply Last reply
        0
        • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

          9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

          Link Preview Image
          New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

          The 40,000-acre project will run entirely off-grid using natural gas.

          favicon

          Tom's Hardware (www.tomshardware.com)

          phl@mastodon.socialP This user is from outside of this forum
          phl@mastodon.socialP This user is from outside of this forum
          phl@mastodon.social
          wrote last edited by
          #28

          @quixoticgeek Just the thing we need in the middle of a climate crisis.

          1 Reply Last reply
          0
          • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

            9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

            Link Preview Image
            New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

            The 40,000-acre project will run entirely off-grid using natural gas.

            favicon

            Tom's Hardware (www.tomshardware.com)

            marud@social.marud.frM This user is from outside of this forum
            marud@social.marud.frM This user is from outside of this forum
            marud@social.marud.fr
            wrote last edited by
            #29

            @quixoticgeek this is so painful to read 😢

            1 Reply Last reply
            0
            • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

              9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

              Link Preview Image
              New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

              The 40,000-acre project will run entirely off-grid using natural gas.

              favicon

              Tom's Hardware (www.tomshardware.com)

              ehproque@neopaquita.esE This user is from outside of this forum
              ehproque@neopaquita.esE This user is from outside of this forum
              ehproque@neopaquita.es
              wrote last edited by
              #30

              @quixoticgeek how much water then? Where's it coming from?

              quixoticgeek@social.v.stQ mycotropic@beige.partyM dougfir@m.ai6yr.orgD 3 Replies Last reply
              0
              • ehproque@neopaquita.esE ehproque@neopaquita.es

                @quixoticgeek how much water then? Where's it coming from?

                quixoticgeek@social.v.stQ This user is from outside of this forum
                quixoticgeek@social.v.stQ This user is from outside of this forum
                quixoticgeek@social.v.st
                wrote last edited by
                #31

                @ehproque dunno. I'm scared of the answer.

                cppguy@infosec.spaceC 1 Reply Last reply
                0
                • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                  9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                  Link Preview Image
                  New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                  The 40,000-acre project will run entirely off-grid using natural gas.

                  favicon

                  Tom's Hardware (www.tomshardware.com)

                  sassinake@mastodon.socialS This user is from outside of this forum
                  sassinake@mastodon.socialS This user is from outside of this forum
                  sassinake@mastodon.social
                  wrote last edited by
                  #32

                  @quixoticgeek

                  Now that the tech exists to generate fabulous amounts of energy, tech and energy oligarchs immediately found ways to waste it to keep it out of the peasants' reach.

                  1 Reply Last reply
                  0
                  • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                    9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                    Link Preview Image
                    New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                    The 40,000-acre project will run entirely off-grid using natural gas.

                    favicon

                    Tom's Hardware (www.tomshardware.com)

                    mighty_orbot@retro.pizzaM This user is from outside of this forum
                    mighty_orbot@retro.pizzaM This user is from outside of this forum
                    mighty_orbot@retro.pizza
                    wrote last edited by
                    #33

                    @quixoticgeek “2,000 permanent jobs in the county following construction”? Doing what, sweeping the halls?

                    mycotropic@beige.partyM 1 Reply Last reply
                    0
                    • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                      9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                      Link Preview Image
                      New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                      The 40,000-acre project will run entirely off-grid using natural gas.

                      favicon

                      Tom's Hardware (www.tomshardware.com)

                      evoscale@c.imE This user is from outside of this forum
                      evoscale@c.imE This user is from outside of this forum
                      evoscale@c.im
                      wrote last edited by
                      #34

                      @quixoticgeek At scale, such a powerful root infrastructure would require more than one source, like geothermal and wind, to justify such an amount. But placing a singular sourcing is an obvious liability with no backup/complimentary framework. It's like putting a large heavy water nuclear reactor in place, instead of smaller, overlapping modular Thorium, or Natrium reactors.

                      Simply just another #TechBros money-grab, at the taxpayer's expense.

                      1 Reply Last reply
                      0
                      • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                        Based on an estimate of 500g CO2/kWh, the one facility would emit ~40MT of CO2 a year. If this one facility was a country, it would rank about 67th, just behind Bulgaria.

                        Concentrating this much energy use in a single location is going to change weather patterns. The environmental impact is just mind boggling.

                        The AI bubble can't burst soon enough.

                        Y This user is from outside of this forum
                        Y This user is from outside of this forum
                        ysotomayor@mastodon.social
                        wrote last edited by
                        #35

                        @quixoticgeek Utah is already at the brink of collapse due to large farms with little to no environmental management, extremely poor water management, and the ever increasing air pollution in the Wasatch Valley where most of the people live. Add to that the ultra conservative majority that have been brainwashed by politicians and the mormon church, and you got a massive environmental desaster in the next 20 years.

                        1 Reply Last reply
                        0
                        • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                          Based on an estimate of 500g CO2/kWh, the one facility would emit ~40MT of CO2 a year. If this one facility was a country, it would rank about 67th, just behind Bulgaria.

                          Concentrating this much energy use in a single location is going to change weather patterns. The environmental impact is just mind boggling.

                          The AI bubble can't burst soon enough.

                          Y This user is from outside of this forum
                          Y This user is from outside of this forum
                          ysotomayor@mastodon.social
                          wrote last edited by
                          #36

                          @quixoticgeek The best years of my life were spend in SLC, and I still have a lot of great friends living there. Shit like this make me worry a lot.

                          1 Reply Last reply
                          0
                          • R relay@relay.mycrowd.ca shared this topic
                          • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                            9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                            Link Preview Image
                            New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                            The 40,000-acre project will run entirely off-grid using natural gas.

                            favicon

                            Tom's Hardware (www.tomshardware.com)

                            ansible42@social.ridetrans.itA This user is from outside of this forum
                            ansible42@social.ridetrans.itA This user is from outside of this forum
                            ansible42@social.ridetrans.it
                            wrote last edited by
                            #37

                            @quixoticgeek I honestly bet they run out of financing and never finish it.

                            Data center scam has to die.

                            1 Reply Last reply
                            0
                            • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                              9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                              Link Preview Image
                              New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                              The 40,000-acre project will run entirely off-grid using natural gas.

                              favicon

                              Tom's Hardware (www.tomshardware.com)

                              bluewaver22@genomic.socialB This user is from outside of this forum
                              bluewaver22@genomic.socialB This user is from outside of this forum
                              bluewaver22@genomic.social
                              wrote last edited by
                              #38

                              @quixoticgeek we’ve become such a shithole country. These things are going to be disastrous.

                              1 Reply Last reply
                              0
                              • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                                Link Preview Image
                                New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                                The 40,000-acre project will run entirely off-grid using natural gas.

                                favicon

                                Tom's Hardware (www.tomshardware.com)

                                remittancegirl@mstdn.socialR This user is from outside of this forum
                                remittancegirl@mstdn.socialR This user is from outside of this forum
                                remittancegirl@mstdn.social
                                wrote last edited by
                                #39

                                @quixoticgeek And not a single panel of solar?

                                And... when it fails, will they turn it into another detention centre for people they don't like?

                                mycotropic@beige.partyM tubemeister@mstdn.socialT 2 Replies Last reply
                                0
                                • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                  9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                                  Link Preview Image
                                  New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                                  The 40,000-acre project will run entirely off-grid using natural gas.

                                  favicon

                                  Tom's Hardware (www.tomshardware.com)

                                  christo_459@mastodon.me.ukC This user is from outside of this forum
                                  christo_459@mastodon.me.ukC This user is from outside of this forum
                                  christo_459@mastodon.me.uk
                                  wrote last edited by
                                  #40

                                  @quixoticgeek
                                  We should ban all these huge data centres. We don't need AI

                                  1 Reply Last reply
                                  0
                                  • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                    9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                                    Link Preview Image
                                    New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                                    The 40,000-acre project will run entirely off-grid using natural gas.

                                    favicon

                                    Tom's Hardware (www.tomshardware.com)

                                    catwoman69y2k@meow.socialC This user is from outside of this forum
                                    catwoman69y2k@meow.socialC This user is from outside of this forum
                                    catwoman69y2k@meow.social
                                    wrote last edited by
                                    #41

                                    @quixoticgeek ...and it will be the people of Utah who will pay the bill (higher electricity bills, issues with water supply and pressure, etc...)

                                    1 Reply Last reply
                                    0
                                    • quoidian@mastodon.onlineQ quoidian@mastodon.online

                                      @Seb1982 @quixoticgeek
                                      Disable the cooling system.

                                      mycotropic@beige.partyM This user is from outside of this forum
                                      mycotropic@beige.partyM This user is from outside of this forum
                                      mycotropic@beige.party
                                      wrote last edited by
                                      #42

                                      @quoidian @Seb1982 @quixoticgeek

                                      #Zodiac was a good book.

                                      1 Reply Last reply
                                      0
                                      • ehproque@neopaquita.esE ehproque@neopaquita.es

                                        @quixoticgeek how much water then? Where's it coming from?

                                        mycotropic@beige.partyM This user is from outside of this forum
                                        mycotropic@beige.partyM This user is from outside of this forum
                                        mycotropic@beige.party
                                        wrote last edited by
                                        #43

                                        @ehproque @quixoticgeek

                                        See the Colorado River is filled up with water from snow melt that's is eternal, neverending and limitless so.......

                                        ehproque@neopaquita.esE 1 Reply Last reply
                                        0
                                        • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                          9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                                          Link Preview Image
                                          New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                                          The 40,000-acre project will run entirely off-grid using natural gas.

                                          favicon

                                          Tom's Hardware (www.tomshardware.com)

                                          mugsysrapsheet@mastodon.socialM This user is from outside of this forum
                                          mugsysrapsheet@mastodon.socialM This user is from outside of this forum
                                          mugsysrapsheet@mastodon.social
                                          wrote last edited by
                                          #44

                                          @quixoticgeek
                                          Countries need to require all #DataCenters to generate their own (#green) electricity (and only use water-free cooling.)

                                          1 Reply Last reply
                                          0
                                          Reply
                                          • Reply as topic
                                          Log in to reply
                                          • Oldest to Newest
                                          • Newest to Oldest
                                          • Most Votes


                                          • Login

                                          • Login or register to search.
                                          • First post
                                            Last post
                                          0
                                          • Categories
                                          • Recent
                                          • Tags
                                          • Popular
                                          • World
                                          • Users
                                          • Groups