Skip to content
  • Categories
  • Recent
  • Tags
  • Popular
  • World
  • Users
  • Groups
Skins
  • Light
  • Brite
  • Cerulean
  • Cosmo
  • Flatly
  • Journal
  • Litera
  • Lumen
  • Lux
  • Materia
  • Minty
  • Morph
  • Pulse
  • Sandstone
  • Simplex
  • Sketchy
  • Spacelab
  • United
  • Yeti
  • Zephyr
  • Dark
  • Cyborg
  • Darkly
  • Quartz
  • Slate
  • Solar
  • Superhero
  • Vapor

  • Default (Cyborg)
  • No Skin
Collapse
Brand Logo

CIRCLE WITH A DOT

  1. Home
  2. Uncategorized
  3. 9GW datacentre approved.

9GW datacentre approved.

Scheduled Pinned Locked Moved Uncategorized
109 Posts 68 Posters 0 Views
  • Oldest to Newest
  • Newest to Oldest
  • Most Votes
Reply
  • Reply as topic
Log in to reply
This topic has been deleted. Only users with topic management privileges can see it.
  • freya@social.highenergymagic.netF freya@social.highenergymagic.net

    @quixoticgeek lol 9GW, that'll never get built. they can barely get 1GW DCs off the bloody ground, half of them are literally piles of scrap metal and construction trash, last I checked. worst this'll do, funnel a bunch of bloody money to some kind of AI DC construction company that's entirely a scam, and go precisely nowhere.

    peteriskrisjanis@toot.lvP This user is from outside of this forum
    peteriskrisjanis@toot.lvP This user is from outside of this forum
    peteriskrisjanis@toot.lv
    wrote last edited by
    #13

    @freya @quixoticgeek yeah this pretty much a scam project, considering that AI usage is falling and crash is inevitable

    lovemakeshare@sunny.gardenL 1 Reply Last reply
    0
    • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

      9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

      Link Preview Image
      New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

      The 40,000-acre project will run entirely off-grid using natural gas.

      favicon

      Tom's Hardware (www.tomshardware.com)

      ferricoxide@blahaj.zoneF This user is from outside of this forum
      ferricoxide@blahaj.zoneF This user is from outside of this forum
      ferricoxide@blahaj.zone
      wrote last edited by
      #14

      @quixoticgeek@v.st

      Sounds not unlike what's going on in the US.

      Datacenter builders love deserts:

      * Land is cheap

      * Large, contiguous chunks of land are easier to come by

      * Fewer neighbors to contend with

      * Generally less stuff that needs to be bulldozed to build the datacenter, itself, and the infrastructure that feeds it.

      quixoticgeek@social.v.stQ marjolica@social.linux.pizzaM 2 Replies Last reply
      0
      • ferricoxide@blahaj.zoneF ferricoxide@blahaj.zone

        @quixoticgeek@v.st

        Sounds not unlike what's going on in the US.

        Datacenter builders love deserts:

        * Land is cheap

        * Large, contiguous chunks of land are easier to come by

        * Fewer neighbors to contend with

        * Generally less stuff that needs to be bulldozed to build the datacenter, itself, and the infrastructure that feeds it.

        quixoticgeek@social.v.stQ This user is from outside of this forum
        quixoticgeek@social.v.stQ This user is from outside of this forum
        quixoticgeek@social.v.st
        wrote last edited by
        #15

        @ferricoxide Utah being in the US. Yes, it's very similar to what's going on in the US...

        ferricoxide@blahaj.zoneF 1 Reply Last reply
        0
        • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

          9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

          Link Preview Image
          New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

          The 40,000-acre project will run entirely off-grid using natural gas.

          favicon

          Tom's Hardware (www.tomshardware.com)

          mindpersephone@spookygirl.booM This user is from outside of this forum
          mindpersephone@spookygirl.booM This user is from outside of this forum
          mindpersephone@spookygirl.boo
          wrote last edited by
          #16

          @quixoticgeek that's ~45 CERNs?! WTF?

          Forty five of the thing they joked might be able to create a black hole and end the world, in a single site?

          ~ one Saturn 5 F1 main engine burning constantly for the life time of the site not just a few hundred seconds

          This is a stupid amount of energy use.

          mindpersephone@spookygirl.booM 1 Reply Last reply
          0
          • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

            @ferricoxide Utah being in the US. Yes, it's very similar to what's going on in the US...

            ferricoxide@blahaj.zoneF This user is from outside of this forum
            ferricoxide@blahaj.zoneF This user is from outside of this forum
            ferricoxide@blahaj.zone
            wrote last edited by
            #17

            @quixoticgeek@v.st

            Oop. I saw the UK mention and didn't see that my instance had hidden the link behind a "more" button. So, assumed reference was to the UK allowing similar idiocy to what's going on in the US.

            1 Reply Last reply
            0
            • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

              Based on an estimate of 500g CO2/kWh, the one facility would emit ~40MT of CO2 a year. If this one facility was a country, it would rank about 67th, just behind Bulgaria.

              Concentrating this much energy use in a single location is going to change weather patterns. The environmental impact is just mind boggling.

              The AI bubble can't burst soon enough.

              woe2you@beige.partyW This user is from outside of this forum
              woe2you@beige.partyW This user is from outside of this forum
              woe2you@beige.party
              wrote last edited by
              #18

              @quixoticgeek Cast iron proof that it's a boondoggle: they're powering it with fossil fuels because they know the bubble will burst before the TTBE of renewables.

              1 Reply Last reply
              0
              • mindpersephone@spookygirl.booM mindpersephone@spookygirl.boo

                @quixoticgeek that's ~45 CERNs?! WTF?

                Forty five of the thing they joked might be able to create a black hole and end the world, in a single site?

                ~ one Saturn 5 F1 main engine burning constantly for the life time of the site not just a few hundred seconds

                This is a stupid amount of energy use.

                mindpersephone@spookygirl.booM This user is from outside of this forum
                mindpersephone@spookygirl.booM This user is from outside of this forum
                mindpersephone@spookygirl.boo
                wrote last edited by
                #19

                @quixoticgeek hang on the thing runs on gas, so an f1 engine gives a vague idea of how much gas its going to need. ~A Saturn five first stage fuel tank every fifteen minutes (rounding to a nice round number)

                If you've ever seen a person standing next to a Saturn five you have an idea how utterly absurd an amount of fuel that is.

                With out the pipeline that places shuts down. And we thought the back hoe through the fiber link was a bad problem.

                profpatsch@mastodon.xyzP 1 Reply Last reply
                0
                • ferricoxide@blahaj.zoneF ferricoxide@blahaj.zone

                  @quixoticgeek@v.st

                  Sounds not unlike what's going on in the US.

                  Datacenter builders love deserts:

                  * Land is cheap

                  * Large, contiguous chunks of land are easier to come by

                  * Fewer neighbors to contend with

                  * Generally less stuff that needs to be bulldozed to build the datacenter, itself, and the infrastructure that feeds it.

                  marjolica@social.linux.pizzaM This user is from outside of this forum
                  marjolica@social.linux.pizzaM This user is from outside of this forum
                  marjolica@social.linux.pizza
                  wrote last edited by
                  #20

                  @ferricoxide @quixoticgeek "Datacenter builders love deserts"

                  ..and deserts usually have such a plentiful supply of water for cooling.

                  Presumably they will take the water from Lake Powell?

                  Link Preview Image
                  The costs of surging water into drought-depleted Lake Powell will be widespread

                  Lake Powell is at just 23% capacity and approaching the point where water won't be able to flow into its hydroelectric turbines without air causing damage.

                  favicon

                  KUER (www.kuer.org)

                  1 Reply Last reply
                  0
                  • syklemil@snabelen.noS syklemil@snabelen.no

                    @quixoticgeek
                    Solar & wind are still cheaper than gas though, so still a weird choice
                    @CppGuy

                    cppguy@infosec.spaceC This user is from outside of this forum
                    cppguy@infosec.spaceC This user is from outside of this forum
                    cppguy@infosec.space
                    wrote last edited by
                    #21

                    @syklemil @quixoticgeek

                    They're building the thing in a desert, i.e. an expanse of unused space. If they had to build this monstrosity at all, they could have used some of that space for renewable energy generation.

                    1 Reply Last reply
                    0
                    • syklemil@snabelen.noS syklemil@snabelen.no

                      @quixoticgeek
                      Solar & wind are still cheaper than gas though, so still a weird choice
                      @CppGuy

                      brokar@mastodon.socialB This user is from outside of this forum
                      brokar@mastodon.socialB This user is from outside of this forum
                      brokar@mastodon.social
                      wrote last edited by
                      #22

                      @syklemil @quixoticgeek @CppGuy

                      They will be building power plants for that because no state has 9GW power lying around or spare, not even talking about the cables and infrastructure you'd need to even get the energy there.
                      And since this is a desert, i assume there isn't much water around for cooling.
                      Also, i can only guess the number of backup generators they'd need to secure operation. Gas powered of course. And are they talking about carbon neutrality? Being the good greenwashing company?

                      1 Reply Last reply
                      0
                      • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                        9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                        Link Preview Image
                        New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                        The 40,000-acre project will run entirely off-grid using natural gas.

                        favicon

                        Tom's Hardware (www.tomshardware.com)

                        artemis@climatejustice.socialA This user is from outside of this forum
                        artemis@climatejustice.socialA This user is from outside of this forum
                        artemis@climatejustice.social
                        wrote last edited by
                        #23

                        @quixoticgeek and isn't 'natural gas' just the most newspeak name for a fossil fuel.

                        quixoticgeek@social.v.stQ 1 Reply Last reply
                        0
                        • artemis@climatejustice.socialA artemis@climatejustice.social

                          @quixoticgeek and isn't 'natural gas' just the most newspeak name for a fossil fuel.

                          quixoticgeek@social.v.stQ This user is from outside of this forum
                          quixoticgeek@social.v.stQ This user is from outside of this forum
                          quixoticgeek@social.v.st
                          wrote last edited by
                          #24

                          @artemis ok. So natural gas is because for many years the gas network in most places was derived from coal gas, or town gas, whereby coal was heated up to produce coke, which was used in things like steel production, and the gas was then piped locally to homes and businesses. Natural gas as a fuel source is relatively recent. In the UK we're talking later half of the 20th century.

                          artemis@climatejustice.socialA 1 Reply Last reply
                          0
                          • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                            9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                            Link Preview Image
                            New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                            The 40,000-acre project will run entirely off-grid using natural gas.

                            favicon

                            Tom's Hardware (www.tomshardware.com)

                            shivviness@beige.partyS This user is from outside of this forum
                            shivviness@beige.partyS This user is from outside of this forum
                            shivviness@beige.party
                            wrote last edited by
                            #25

                            @quixoticgeek

                            People need to understand that these datacentres are not just for generating fun pics, they're intended to replace workers en masse, and they're going to ultimately replaces wages.

                            And there's no way Universal Basic Income will be even considered, and notwithstanding the BS that Musk has been spouting recently in favour of UBI.

                            pst@tldr.nettime.orgP 1 Reply Last reply
                            0
                            • seb1982@norden.socialS seb1982@norden.social

                              @quixoticgeek I would like to bring in a completely different aspect:
                              As the data centre runs entirely on natural gas, sabotaging the whole facility seems to be quite an easy thing to do.

                              quoidian@mastodon.onlineQ This user is from outside of this forum
                              quoidian@mastodon.onlineQ This user is from outside of this forum
                              quoidian@mastodon.online
                              wrote last edited by
                              #26

                              @Seb1982 @quixoticgeek
                              Disable the cooling system.

                              mycotropic@beige.partyM 1 Reply Last reply
                              0
                              • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                                Link Preview Image
                                New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                                The 40,000-acre project will run entirely off-grid using natural gas.

                                favicon

                                Tom's Hardware (www.tomshardware.com)

                                carstenfranke@mastodon.socialC This user is from outside of this forum
                                carstenfranke@mastodon.socialC This user is from outside of this forum
                                carstenfranke@mastodon.social
                                wrote last edited by
                                #27

                                @quixoticgeek and there is an even bigger one planned .. link in the article.
                                I am really not sure where the money will be to pay for all this computing...

                                Link Preview Image
                                1 Reply Last reply
                                0
                                • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                  9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                                  Link Preview Image
                                  New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                                  The 40,000-acre project will run entirely off-grid using natural gas.

                                  favicon

                                  Tom's Hardware (www.tomshardware.com)

                                  phl@mastodon.socialP This user is from outside of this forum
                                  phl@mastodon.socialP This user is from outside of this forum
                                  phl@mastodon.social
                                  wrote last edited by
                                  #28

                                  @quixoticgeek Just the thing we need in the middle of a climate crisis.

                                  1 Reply Last reply
                                  0
                                  • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                    9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                                    Link Preview Image
                                    New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                                    The 40,000-acre project will run entirely off-grid using natural gas.

                                    favicon

                                    Tom's Hardware (www.tomshardware.com)

                                    marud@social.marud.frM This user is from outside of this forum
                                    marud@social.marud.frM This user is from outside of this forum
                                    marud@social.marud.fr
                                    wrote last edited by
                                    #29

                                    @quixoticgeek this is so painful to read 😢

                                    1 Reply Last reply
                                    0
                                    • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                      9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                                      Link Preview Image
                                      New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                                      The 40,000-acre project will run entirely off-grid using natural gas.

                                      favicon

                                      Tom's Hardware (www.tomshardware.com)

                                      ehproque@neopaquita.esE This user is from outside of this forum
                                      ehproque@neopaquita.esE This user is from outside of this forum
                                      ehproque@neopaquita.es
                                      wrote last edited by
                                      #30

                                      @quixoticgeek how much water then? Where's it coming from?

                                      quixoticgeek@social.v.stQ mycotropic@beige.partyM dougfir@m.ai6yr.orgD 3 Replies Last reply
                                      0
                                      • ehproque@neopaquita.esE ehproque@neopaquita.es

                                        @quixoticgeek how much water then? Where's it coming from?

                                        quixoticgeek@social.v.stQ This user is from outside of this forum
                                        quixoticgeek@social.v.stQ This user is from outside of this forum
                                        quixoticgeek@social.v.st
                                        wrote last edited by
                                        #31

                                        @ehproque dunno. I'm scared of the answer.

                                        cppguy@infosec.spaceC 1 Reply Last reply
                                        0
                                        • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                          9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                                          Link Preview Image
                                          New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                                          The 40,000-acre project will run entirely off-grid using natural gas.

                                          favicon

                                          Tom's Hardware (www.tomshardware.com)

                                          sassinake@mastodon.socialS This user is from outside of this forum
                                          sassinake@mastodon.socialS This user is from outside of this forum
                                          sassinake@mastodon.social
                                          wrote last edited by
                                          #32

                                          @quixoticgeek

                                          Now that the tech exists to generate fabulous amounts of energy, tech and energy oligarchs immediately found ways to waste it to keep it out of the peasants' reach.

                                          1 Reply Last reply
                                          0
                                          Reply
                                          • Reply as topic
                                          Log in to reply
                                          • Oldest to Newest
                                          • Newest to Oldest
                                          • Most Votes


                                          • Login

                                          • Login or register to search.
                                          • First post
                                            Last post
                                          0
                                          • Categories
                                          • Recent
                                          • Tags
                                          • Popular
                                          • World
                                          • Users
                                          • Groups