Skip to content
  • Categories
  • Recent
  • Tags
  • Popular
  • World
  • Users
  • Groups
Skins
  • Light
  • Brite
  • Cerulean
  • Cosmo
  • Flatly
  • Journal
  • Litera
  • Lumen
  • Lux
  • Materia
  • Minty
  • Morph
  • Pulse
  • Sandstone
  • Simplex
  • Sketchy
  • Spacelab
  • United
  • Yeti
  • Zephyr
  • Dark
  • Cyborg
  • Darkly
  • Quartz
  • Slate
  • Solar
  • Superhero
  • Vapor

  • Default (Cyborg)
  • No Skin
Collapse
Brand Logo

CIRCLE WITH A DOT

  1. Home
  2. Uncategorized
  3. πŸ”Ž CVE-2026-41202: CRITICAL path traversal in ci4ms (<0.31.5.0) lets authenticated users upload ZIPs for remote code execution.

πŸ”Ž CVE-2026-41202: CRITICAL path traversal in ci4ms (<0.31.5.0) lets authenticated users upload ZIPs for remote code execution.

Scheduled Pinned Locked Moved Uncategorized
offseqinfoseccve202641202vuln
1 Posts 1 Posters 0 Views
  • Oldest to Newest
  • Newest to Oldest
  • Most Votes
Reply
  • Reply as topic
Log in to reply
This topic has been deleted. Only users with topic management privileges can see it.
  • offseq@infosec.exchangeO This user is from outside of this forum
    offseq@infosec.exchangeO This user is from outside of this forum
    offseq@infosec.exchange
    wrote last edited by
    #1

    πŸ”Ž CVE-2026-41202: CRITICAL path traversal in ci4ms (<0.31.5.0) lets authenticated users upload ZIPs for remote code execution. Patch to 0.31.5.0 now! Details: https://radar.offseq.com/threat/cve-2026-41202-cwe-22-improper-limitation-of-a-pat-c7627c61 #OffSeq #infosec #CVE202641202 #vuln

    Link Preview Image
    1 Reply Last reply
    1
    0
    • R relay@relay.infosec.exchange shared this topic
    Reply
    • Reply as topic
    Log in to reply
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes


    • Login

    • Login or register to search.
    • First post
      Last post
    0
    • Categories
    • Recent
    • Tags
    • Popular
    • World
    • Users
    • Groups