Skip to content
  • Categories
  • Recent
  • Tags
  • Popular
  • World
  • Users
  • Groups
Skins
  • Light
  • Brite
  • Cerulean
  • Cosmo
  • Flatly
  • Journal
  • Litera
  • Lumen
  • Lux
  • Materia
  • Minty
  • Morph
  • Pulse
  • Sandstone
  • Simplex
  • Sketchy
  • Spacelab
  • United
  • Yeti
  • Zephyr
  • Dark
  • Cyborg
  • Darkly
  • Quartz
  • Slate
  • Solar
  • Superhero
  • Vapor

  • Default (Cyborg)
  • No Skin
Collapse
Brand Logo

CIRCLE WITH A DOT

  1. Home
  2. Uncategorized
  3. 📺 “Balade à bord du REM | Antenne Anse-à-l’Orme”

📺 “Balade à bord du REM | Antenne Anse-à-l’Orme”

Scheduled Pinned Locked Moved Uncategorized
montrealtransit
19 Posts 4 Posters 0 Views
  • Oldest to Newest
  • Newest to Oldest
  • Most Votes
Reply
  • Reply as topic
Log in to reply
This topic has been deleted. Only users with topic management privileges can see it.
  • heliomass@cosocial.caH heliomass@cosocial.ca

    @jfmezei Was having a think about this, and yeah I do get it. With regards to the DM line I’d place much of the blame with the ATM of the day. The infrastructure was so underused it left the door wide open for someone to come along and propose a better use.

    (1/2)

    heliomass@cosocial.caH This user is from outside of this forum
    heliomass@cosocial.caH This user is from outside of this forum
    heliomass@cosocial.ca
    wrote last edited by
    #10

    @jfmezei But it sucks to have gone 5 years without a quick way to get downtown, not to mention all the construction.

    I do agree the REM has been something imposed on local populations without their consultation (likewise for bus alterations). I can only hope they’re smart enough to listen to feedback and make adjustments going forward.

    (2/2)

    1 Reply Last reply
    0
    • heliomass@cosocial.caH heliomass@cosocial.ca

      @jfmezei Was having a think about this, and yeah I do get it. With regards to the DM line I’d place much of the blame with the ATM of the day. The infrastructure was so underused it left the door wide open for someone to come along and propose a better use.

      (1/2)

      jfmezei@cosocial.caJ This user is from outside of this forum
      jfmezei@cosocial.caJ This user is from outside of this forum
      jfmezei@cosocial.ca
      wrote last edited by
      #11

      @heliomass Timing is everything: AMT had, in 2014, obtained the line to Deux Montagnes and later the tunnel. It paid to remove the diamond with the CN St-Laurent sub which limited frequencies. And had finnaly gotten approval to run the NJ Transit Multi Level cars through the tunnel for the Mascouche line and its goal was to deploy them on Deux Montagnes and increase frequency. Before that could happen, CDPQ happened and took everythin.

      heliomass@cosocial.caH 1 Reply Last reply
      0
      • heliomass@cosocial.caH heliomass@cosocial.ca

        @jfmezei Was having a think about this, and yeah I do get it. With regards to the DM line I’d place much of the blame with the ATM of the day. The infrastructure was so underused it left the door wide open for someone to come along and propose a better use.

        (1/2)

        jfmezei@cosocial.caJ This user is from outside of this forum
        jfmezei@cosocial.caJ This user is from outside of this forum
        jfmezei@cosocial.ca
        wrote last edited by
        #12

        @heliomass In Toronto, the geeks spoke interminably about the Davenport diamond elimination but never ever mentioned that AMT had done the same in Montréal with an eye to increasing frequencies and capacity on Deux Montagnes.

        1 Reply Last reply
        0
        • jfmezei@cosocial.caJ jfmezei@cosocial.ca

          @heliomass Timing is everything: AMT had, in 2014, obtained the line to Deux Montagnes and later the tunnel. It paid to remove the diamond with the CN St-Laurent sub which limited frequencies. And had finnaly gotten approval to run the NJ Transit Multi Level cars through the tunnel for the Mascouche line and its goal was to deploy them on Deux Montagnes and increase frequency. Before that could happen, CDPQ happened and took everythin.

          heliomass@cosocial.caH This user is from outside of this forum
          heliomass@cosocial.caH This user is from outside of this forum
          heliomass@cosocial.ca
          wrote last edited by
          #13

          @jfmezei Oh, you mean where the DM line crossed the line to Mascouche was a grade crossing?

          jfmezei@cosocial.caJ 1 Reply Last reply
          0
          • heliomass@cosocial.caH heliomass@cosocial.ca

            @jfmezei Oh, you mean where the DM line crossed the line to Mascouche was a grade crossing?

            jfmezei@cosocial.caJ This user is from outside of this forum
            jfmezei@cosocial.caJ This user is from outside of this forum
            jfmezei@cosocial.ca
            wrote last edited by
            #14

            @heliomass Yep.

            Work started 2012 and by 2015 CN's St Laurent sub passed over the Deux Montagnes line. This was a big project and AMT paid for double track capability on the CN line. And REM got that for free before AMT could start to increase frequencies after eliminating this bottleneck.

            Link Preview ImageLink Preview ImageLink Preview ImageLink Preview Image
            heliomass@cosocial.caH 1 Reply Last reply
            0
            • jfmezei@cosocial.caJ jfmezei@cosocial.ca

              @heliomass Yep.

              Work started 2012 and by 2015 CN's St Laurent sub passed over the Deux Montagnes line. This was a big project and AMT paid for double track capability on the CN line. And REM got that for free before AMT could start to increase frequencies after eliminating this bottleneck.

              Link Preview ImageLink Preview ImageLink Preview ImageLink Preview Image
              heliomass@cosocial.caH This user is from outside of this forum
              heliomass@cosocial.caH This user is from outside of this forum
              heliomass@cosocial.ca
              wrote last edited by
              #15

              @jfmezei Oh wow. I could see how that would have been problematic. The UK only has one remaining diamond crossing, on the East Coast Main Line near Retford. Makes a hell of a thump when the train goes over it!

              jfmezei@cosocial.caJ 1 Reply Last reply
              0
              • heliomass@cosocial.caH heliomass@cosocial.ca

                @jfmezei Oh wow. I could see how that would have been problematic. The UK only has one remaining diamond crossing, on the East Coast Main Line near Retford. Makes a hell of a thump when the train goes over it!

                jfmezei@cosocial.caJ This user is from outside of this forum
                jfmezei@cosocial.caJ This user is from outside of this forum
                jfmezei@cosocial.ca
                wrote last edited by
                #16

                @heliomass If you take train to Ottawa, there is a big diamond crossing at de Beaujeau QC near Ontario Border.

                https://www.google.ca/maps/@45.3263995,-74.3321259,810m/data=!3m1!1e3?entry=ttu&g_ep=EgoyMDI2MDUyMC4wIKXMDSoASAFQAw%3D%3D

                VIA has a siding just north/west of the diamond in case 2 of its trains in opposite directions are stopped by long slow CPKC train, so one train can pass through after tracks are cleared.

                Link Preview ImageLink Preview ImageLink Preview Image
                jfmezei@cosocial.caJ 1 Reply Last reply
                0
                • jfmezei@cosocial.caJ jfmezei@cosocial.ca

                  @heliomass If you take train to Ottawa, there is a big diamond crossing at de Beaujeau QC near Ontario Border.

                  https://www.google.ca/maps/@45.3263995,-74.3321259,810m/data=!3m1!1e3?entry=ttu&g_ep=EgoyMDI2MDUyMC4wIKXMDSoASAFQAw%3D%3D

                  VIA has a siding just north/west of the diamond in case 2 of its trains in opposite directions are stopped by long slow CPKC train, so one train can pass through after tracks are cleared.

                  Link Preview ImageLink Preview ImageLink Preview Image
                  jfmezei@cosocial.caJ This user is from outside of this forum
                  jfmezei@cosocial.caJ This user is from outside of this forum
                  jfmezei@cosocial.ca
                  wrote last edited by
                  #17

                  @heliomass Just realized. The de Beaujeu diamond is at an angle. So not an off-the-shelf diamond CP/CN (at the time) bought at Costco, but specially forged 32 pieces for the 2 CP tracks/1 CN/VIA track) at the specific angle those tracks cross each other.

                  heliomass@cosocial.caH 1 Reply Last reply
                  0
                  • jfmezei@cosocial.caJ jfmezei@cosocial.ca

                    @heliomass Just realized. The de Beaujeu diamond is at an angle. So not an off-the-shelf diamond CP/CN (at the time) bought at Costco, but specially forged 32 pieces for the 2 CP tracks/1 CN/VIA track) at the specific angle those tracks cross each other.

                    heliomass@cosocial.caH This user is from outside of this forum
                    heliomass@cosocial.caH This user is from outside of this forum
                    heliomass@cosocial.ca
                    wrote last edited by
                    #18

                    @jfmezei Wouldn’t that be the case for all crossing diamonds? No two alignments are going to pass each other at exactly the same angle I would have thought. I’d imagine perpendicular crossings are the exception.

                    edwing@mstdn.moimeme.caE 1 Reply Last reply
                    0
                    • heliomass@cosocial.caH heliomass@cosocial.ca

                      @jfmezei Wouldn’t that be the case for all crossing diamonds? No two alignments are going to pass each other at exactly the same angle I would have thought. I’d imagine perpendicular crossings are the exception.

                      edwing@mstdn.moimeme.caE This user is from outside of this forum
                      edwing@mstdn.moimeme.caE This user is from outside of this forum
                      edwing@mstdn.moimeme.ca
                      wrote last edited by
                      #19

                      @heliomass @jfmezei

                      There’s the Walkley Junction between CPKC? and Capital Railway (aka O-Train line 2) that looks a lot like a right angle diamond

                      https://maps.apple/p/-qmCrRtik~8U_y

                      1 Reply Last reply
                      1
                      0
                      • R relay@relay.mycrowd.ca shared this topic
                      Reply
                      • Reply as topic
                      Log in to reply
                      • Oldest to Newest
                      • Newest to Oldest
                      • Most Votes


                      • Login

                      • Login or register to search.
                      • First post
                        Last post
                      0
                      • Categories
                      • Recent
                      • Tags
                      • Popular
                      • World
                      • Users
                      • Groups