Skip to content
  • Categories
  • Recent
  • Tags
  • Popular
  • World
  • Users
  • Groups
Skins
  • Light
  • Brite
  • Cerulean
  • Cosmo
  • Flatly
  • Journal
  • Litera
  • Lumen
  • Lux
  • Materia
  • Minty
  • Morph
  • Pulse
  • Sandstone
  • Simplex
  • Sketchy
  • Spacelab
  • United
  • Yeti
  • Zephyr
  • Dark
  • Cyborg
  • Darkly
  • Quartz
  • Slate
  • Solar
  • Superhero
  • Vapor

  • Default (Cyborg)
  • No Skin
Collapse
Brand Logo

CIRCLE WITH A DOT

  1. Home
  2. Uncategorized
  3. 9GW datacentre approved.

9GW datacentre approved.

Scheduled Pinned Locked Moved Uncategorized
109 Posts 68 Posters 0 Views
  • Oldest to Newest
  • Newest to Oldest
  • Most Votes
Reply
  • Reply as topic
Log in to reply
This topic has been deleted. Only users with topic management privileges can see it.
  • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

    9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

    Link Preview Image
    New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

    The 40,000-acre project will run entirely off-grid using natural gas.

    favicon

    Tom's Hardware (www.tomshardware.com)

    kentnavalesi@mstdn.socialK This user is from outside of this forum
    kentnavalesi@mstdn.socialK This user is from outside of this forum
    kentnavalesi@mstdn.social
    wrote last edited by
    #77

    @quixoticgeek That bubble can't burst soon enough.

    1 Reply Last reply
    0
    • timwardcam@c.imT timwardcam@c.im

      @quixoticgeek But if it's in a desert it's using locally produced solar power with zero emissions, isn't it?

      vatvslpr@c.imV This user is from outside of this forum
      vatvslpr@c.imV This user is from outside of this forum
      vatvslpr@c.im
      wrote last edited by
      #78

      @TimWardCam @quixoticgeek
      Of course not. If you read the article, it's going to be using some kind of natural gas powered generation, "At full buildout, the campus would reach 9 GW, all produced on-site through a connection to the Ruby Pipeline, a 680-mile interstate natural gas line that crosses northern Utah on its route from Wyoming to Oregon."

      vatvslpr@c.imV 1 Reply Last reply
      0
      • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

        @ehproque dunno. I'm scared of the answer.

        cppguy@infosec.spaceC This user is from outside of this forum
        cppguy@infosec.spaceC This user is from outside of this forum
        cppguy@infosec.space
        wrote last edited by
        #79

        @quixoticgeek @ehproque

        I did a back-of-the-envelope calculation a few months back, suggesting that 1GW is enough to evaporate 33 megalitres of water per day. Obviously, at 9GW, you're looking at nine times that. That number is obscenely, meaninglessly large, so picture a cube measuring 42m × 42m × 42m, fill it to the brim with room-temperature water, and then boil it all off in one day. That's the same volume as a decent-sized tower block.

        Where are they going to find 300 megalitres a day in the desert? How long can they keep that up? How large are the aquifers they're depleting? What effect will it have on the stability of the ground they're building on? When they dump that much water and heat into the atmosphere every day, what effect will it have on the local climate? What effect will it have when the #AI bubble bursts and they stop doing it?

        ehproque@neopaquita.esE 1 Reply Last reply
        0
        • vatvslpr@c.imV vatvslpr@c.im

          @TimWardCam @quixoticgeek
          Of course not. If you read the article, it's going to be using some kind of natural gas powered generation, "At full buildout, the campus would reach 9 GW, all produced on-site through a connection to the Ruby Pipeline, a 680-mile interstate natural gas line that crosses northern Utah on its route from Wyoming to Oregon."

          vatvslpr@c.imV This user is from outside of this forum
          vatvslpr@c.imV This user is from outside of this forum
          vatvslpr@c.im
          wrote last edited by
          #80

          @TimWardCam @quixoticgeek
          I don't know if the AI boom was designed specifically to justify building a bunch more fossil fuel powered generating capacity, but that sure looks like it's an effect. It stinks, because building a ton of renewable power would be a nice consolation prize for the AI boom collapsing.

          rupert@mastodon.nzR 1 Reply Last reply
          0
          • jpaskaruk@growers.socialJ jpaskaruk@growers.social

            @lovemakeshare @peteriskrisjanis @freya @quixoticgeek that fucking piece of fuck

            lovemakeshare@sunny.gardenL This user is from outside of this forum
            lovemakeshare@sunny.gardenL This user is from outside of this forum
            lovemakeshare@sunny.garden
            wrote last edited by
            #81

            @jpaskaruk @peteriskrisjanis @freya @quixoticgeek Not the *specific* words I would have used, but yes.

            Did you know he acquired and killed The Learning Company so hard it almost took down Mattel? And maybe took the whole edutainment software industry with it? 'member that? Pepperidge Farms remembers.

            Link Preview Image
            SoftKey - Wikipedia

            favicon

            (en.wikipedia.org)

            jpaskaruk@growers.socialJ 1 Reply Last reply
            0
            • cppguy@infosec.spaceC cppguy@infosec.space

              @quixoticgeek @ehproque

              I did a back-of-the-envelope calculation a few months back, suggesting that 1GW is enough to evaporate 33 megalitres of water per day. Obviously, at 9GW, you're looking at nine times that. That number is obscenely, meaninglessly large, so picture a cube measuring 42m × 42m × 42m, fill it to the brim with room-temperature water, and then boil it all off in one day. That's the same volume as a decent-sized tower block.

              Where are they going to find 300 megalitres a day in the desert? How long can they keep that up? How large are the aquifers they're depleting? What effect will it have on the stability of the ground they're building on? When they dump that much water and heat into the atmosphere every day, what effect will it have on the local climate? What effect will it have when the #AI bubble bursts and they stop doing it?

              ehproque@neopaquita.esE This user is from outside of this forum
              ehproque@neopaquita.esE This user is from outside of this forum
              ehproque@neopaquita.es
              wrote last edited by
              #82

              @CppGuy @quixoticgeek where did they find the water to make a city in the desert? 🤷🏻‍♂️ They'll bring it from elsewhere. And what will the people of elsewhere drink? Brawndo! What your body craves!

              1 Reply Last reply
              0
              • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                Link Preview Image
                New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                The 40,000-acre project will run entirely off-grid using natural gas.

                favicon

                Tom's Hardware (www.tomshardware.com)

                scm@sfba.socialS This user is from outside of this forum
                scm@sfba.socialS This user is from outside of this forum
                scm@sfba.social
                wrote last edited by
                #83

                @quixoticgeek According to Wikipedia: “In 2024, Utah had a total summer capacity of 10.3 GW through all of its power plants”

                So it’s going to basically use the equivalent of all the power generated in Utah

                1 Reply Last reply
                0
                • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                  9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                  Link Preview Image
                  New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                  The 40,000-acre project will run entirely off-grid using natural gas.

                  favicon

                  Tom's Hardware (www.tomshardware.com)

                  dougfir@m.ai6yr.orgD This user is from outside of this forum
                  dougfir@m.ai6yr.orgD This user is from outside of this forum
                  dougfir@m.ai6yr.org
                  wrote last edited by
                  #84

                  @quixoticgeek
                  Did you also note the proposed site is served by one 2 lane road? Back when they were building the natural gas pipeline, the one 6 room motel in the area was pretty busy. All other workers had to drive about 1½ hours from any sort of accommodation.

                  dougfir@m.ai6yr.orgD 1 Reply Last reply
                  0
                  • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                    9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                    Link Preview Image
                    New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                    The 40,000-acre project will run entirely off-grid using natural gas.

                    favicon

                    Tom's Hardware (www.tomshardware.com)

                    wtarbiat@mastodon.socialW This user is from outside of this forum
                    wtarbiat@mastodon.socialW This user is from outside of this forum
                    wtarbiat@mastodon.social
                    wrote last edited by
                    #85

                    @quixoticgeek may not even get built lol.

                    1 Reply Last reply
                    0
                    • vatvslpr@c.imV vatvslpr@c.im

                      @TimWardCam @quixoticgeek
                      I don't know if the AI boom was designed specifically to justify building a bunch more fossil fuel powered generating capacity, but that sure looks like it's an effect. It stinks, because building a ton of renewable power would be a nice consolation prize for the AI boom collapsing.

                      rupert@mastodon.nzR This user is from outside of this forum
                      rupert@mastodon.nzR This user is from outside of this forum
                      rupert@mastodon.nz
                      wrote last edited by
                      #86

                      @VATVSLPR @TimWardCam @quixoticgeek It's who's funding it.

                      timwardcam@c.imT 1 Reply Last reply
                      0
                      • ehproque@neopaquita.esE ehproque@neopaquita.es

                        @quixoticgeek how much water then? Where's it coming from?

                        dougfir@m.ai6yr.orgD This user is from outside of this forum
                        dougfir@m.ai6yr.orgD This user is from outside of this forum
                        dougfir@m.ai6yr.org
                        wrote last edited by
                        #87

                        @ehproque @quixoticgeek
                        They claim they will pump groundwater, purify it because it is too salty as is, then send the hot water to the Great Salt Lake. This site is a long ways from the Colorado River.
                        There is ample area out the covered only in salt grass to install enough solar power including batteries for nights and cloudy days to power the entire united states, let alone some data centers.

                        1 Reply Last reply
                        0
                        • rupert@mastodon.nzR rupert@mastodon.nz

                          @VATVSLPR @TimWardCam @quixoticgeek It's who's funding it.

                          timwardcam@c.imT This user is from outside of this forum
                          timwardcam@c.imT This user is from outside of this forum
                          timwardcam@c.im
                          wrote last edited by
                          #88

                          @rupert @VATVSLPR @quixoticgeek I wonder how all 680 miles of that pipeline are going to be defended 24/7?

                          The rest of the world - and plenty of Americans - would have good reason for blowing it up. Although ... the USA has decided that the new world order is that you can just bomb the shit out of whoever and whatever you like without bothering to think of a justification, so that's even easier.

                          1 Reply Last reply
                          0
                          • lovemakeshare@sunny.gardenL lovemakeshare@sunny.garden

                            @jpaskaruk @peteriskrisjanis @freya @quixoticgeek Not the *specific* words I would have used, but yes.

                            Did you know he acquired and killed The Learning Company so hard it almost took down Mattel? And maybe took the whole edutainment software industry with it? 'member that? Pepperidge Farms remembers.

                            Link Preview Image
                            SoftKey - Wikipedia

                            favicon

                            (en.wikipedia.org)

                            jpaskaruk@growers.socialJ This user is from outside of this forum
                            jpaskaruk@growers.socialJ This user is from outside of this forum
                            jpaskaruk@growers.social
                            wrote last edited by
                            #89

                            @lovemakeshare @peteriskrisjanis @freya @quixoticgeek I remember TLC. It was a good thing.

                            the Usian prez is an affront to all humanity of course, but he can't elicit the visceral hate that an O'Leary or a Nygard can. The rage is much stronger when they come from where you are.

                            Starmer being a notable exception. He's like, if Superman was a Golgothan Shit Demon, Starmer is Clark Kent.

                            1 Reply Last reply
                            0
                            • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                              9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                              Link Preview Image
                              New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                              The 40,000-acre project will run entirely off-grid using natural gas.

                              favicon

                              Tom's Hardware (www.tomshardware.com)

                              stevo618@mastodon.socialS This user is from outside of this forum
                              stevo618@mastodon.socialS This user is from outside of this forum
                              stevo618@mastodon.social
                              wrote last edited by
                              #90

                              @quixoticgeek Kind of insane!

                              1 Reply Last reply
                              0
                              • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                                Link Preview Image
                                New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                                The 40,000-acre project will run entirely off-grid using natural gas.

                                favicon

                                Tom's Hardware (www.tomshardware.com)

                                libertyforward1@beige.partyL This user is from outside of this forum
                                libertyforward1@beige.partyL This user is from outside of this forum
                                libertyforward1@beige.party
                                wrote last edited by
                                #91

                                @quixoticgeek 🤦‍♂️ I grew up in this county. Almost all of my family lives in this county.

                                1 Reply Last reply
                                0
                                • syklemil@snabelen.noS syklemil@snabelen.no

                                  @quixoticgeek
                                  Solar & wind are still cheaper than gas though, so still a weird choice
                                  @CppGuy

                                  mihamarkic@mastodon.socialM This user is from outside of this forum
                                  mihamarkic@mastodon.socialM This user is from outside of this forum
                                  mihamarkic@mastodon.social
                                  wrote last edited by
                                  #92

                                  @syklemil @quixoticgeek @CppGuy Batteries are not, though.

                                  1 Reply Last reply
                                  0
                                  • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                    9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                                    Link Preview Image
                                    New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                                    The 40,000-acre project will run entirely off-grid using natural gas.

                                    favicon

                                    Tom's Hardware (www.tomshardware.com)

                                    brouhaha@mastodon.socialB This user is from outside of this forum
                                    brouhaha@mastodon.socialB This user is from outside of this forum
                                    brouhaha@mastodon.social
                                    wrote last edited by
                                    #93

                                    @quixoticgeek
                                    That biosphere won't just destroy itself, you know.

                                    1 Reply Last reply
                                    0
                                    • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                      9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                                      Link Preview Image
                                      New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                                      The 40,000-acre project will run entirely off-grid using natural gas.

                                      favicon

                                      Tom's Hardware (www.tomshardware.com)

                                      mira@shark.communityM This user is from outside of this forum
                                      mira@shark.communityM This user is from outside of this forum
                                      mira@shark.community
                                      wrote last edited by
                                      #94

                                      @quixoticgeek Not to mention the water that it will require, in state that is in sever drought and whose great salt lake is evaporating away

                                      1 Reply Last reply
                                      0
                                      • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                        9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                                        Link Preview Image
                                        New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                                        The 40,000-acre project will run entirely off-grid using natural gas.

                                        favicon

                                        Tom's Hardware (www.tomshardware.com)

                                        wesdym@mastodon.socialW This user is from outside of this forum
                                        wesdym@mastodon.socialW This user is from outside of this forum
                                        wesdym@mastodon.social
                                        wrote last edited by
                                        #95

                                        @quixoticgeek Utah brought this on themselves, by stupidly electing the kinds of assholes who'd greenlight something like this. My sympathy is limited.

                                        Why this location, I don't know. Maybe the land was cheap. But a lax regulatory environment was undoubtedly a factor.

                                        1 Reply Last reply
                                        0
                                        • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                          9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                                          Link Preview Image
                                          New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                                          The 40,000-acre project will run entirely off-grid using natural gas.

                                          favicon

                                          Tom's Hardware (www.tomshardware.com)

                                          huntingdon@mstdn.socialH This user is from outside of this forum
                                          huntingdon@mstdn.socialH This user is from outside of this forum
                                          huntingdon@mstdn.social
                                          wrote last edited by
                                          #96

                                          @quixoticgeek

                                          It's a cinch that new 9 gw AI software data center in Utah won't be used to process your credit card purchases -- except as part of processing your entire personal file.

                                          1 Reply Last reply
                                          0
                                          Reply
                                          • Reply as topic
                                          Log in to reply
                                          • Oldest to Newest
                                          • Newest to Oldest
                                          • Most Votes


                                          • Login

                                          • Login or register to search.
                                          • First post
                                            Last post
                                          0
                                          • Categories
                                          • Recent
                                          • Tags
                                          • Popular
                                          • World
                                          • Users
                                          • Groups