Skip to content
  • Categories
  • Recent
  • Tags
  • Popular
  • World
  • Users
  • Groups
Skins
  • Light
  • Brite
  • Cerulean
  • Cosmo
  • Flatly
  • Journal
  • Litera
  • Lumen
  • Lux
  • Materia
  • Minty
  • Morph
  • Pulse
  • Sandstone
  • Simplex
  • Sketchy
  • Spacelab
  • United
  • Yeti
  • Zephyr
  • Dark
  • Cyborg
  • Darkly
  • Quartz
  • Slate
  • Solar
  • Superhero
  • Vapor

  • Default (Cyborg)
  • No Skin
Collapse
Brand Logo

CIRCLE WITH A DOT

  1. Home
  2. Uncategorized
  3. 9GW datacentre approved.

9GW datacentre approved.

Scheduled Pinned Locked Moved Uncategorized
109 Posts 68 Posters 0 Views
  • Oldest to Newest
  • Newest to Oldest
  • Most Votes
Reply
  • Reply as topic
Log in to reply
This topic has been deleted. Only users with topic management privileges can see it.
  • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

    9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

    Link Preview Image
    New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

    The 40,000-acre project will run entirely off-grid using natural gas.

    favicon

    Tom's Hardware (www.tomshardware.com)

    babe@glitterkitten.co.ukB This user is from outside of this forum
    babe@glitterkitten.co.ukB This user is from outside of this forum
    babe@glitterkitten.co.uk
    wrote last edited by
    #3

    @quixoticgeek Holy yikes

    quixoticgeek@social.v.stQ 1 Reply Last reply
    0
    • babe@glitterkitten.co.ukB babe@glitterkitten.co.uk

      @quixoticgeek Holy yikes

      quixoticgeek@social.v.stQ This user is from outside of this forum
      quixoticgeek@social.v.stQ This user is from outside of this forum
      quixoticgeek@social.v.st
      wrote last edited by
      #4

      @babe yep.

      1 Reply Last reply
      0
      • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

        9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

        Link Preview Image
        New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

        The 40,000-acre project will run entirely off-grid using natural gas.

        favicon

        Tom's Hardware (www.tomshardware.com)

        cppguy@infosec.spaceC This user is from outside of this forum
        cppguy@infosec.spaceC This user is from outside of this forum
        cppguy@infosec.space
        wrote last edited by
        #5

        @quixoticgeek

        Yeah, but it's even worse than that. The UK grid is decarbonising, but the article says this new #DataCentre will run entirely on natural gas, i.e. fossil fuels. Right now, about an eighth of UK electricity is generated from fossil fuels:

        Link Preview Image
        National Grid: Live

        Shows the live status of Great Britain’s electric power transmission network

        favicon

        (grid.iamkate.com)

        So the new DC will emit about twice as much carbon as all the UK's electricity generation.

        Does the sun not shine in Utah? Does the wind not blow in the desert? Is the climate not changing as fast as the Americans would like? 😡

        #AI #DataCenter #ClimateCrisis

        quixoticgeek@social.v.stQ 1 Reply Last reply
        0
        • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

          9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

          Link Preview Image
          New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

          The 40,000-acre project will run entirely off-grid using natural gas.

          favicon

          Tom's Hardware (www.tomshardware.com)

          seb1982@norden.socialS This user is from outside of this forum
          seb1982@norden.socialS This user is from outside of this forum
          seb1982@norden.social
          wrote last edited by
          #6

          @quixoticgeek I would like to bring in a completely different aspect:
          As the data centre runs entirely on natural gas, sabotaging the whole facility seems to be quite an easy thing to do.

          P quoidian@mastodon.onlineQ 2 Replies Last reply
          0
          • cppguy@infosec.spaceC cppguy@infosec.space

            @quixoticgeek

            Yeah, but it's even worse than that. The UK grid is decarbonising, but the article says this new #DataCentre will run entirely on natural gas, i.e. fossil fuels. Right now, about an eighth of UK electricity is generated from fossil fuels:

            Link Preview Image
            National Grid: Live

            Shows the live status of Great Britain’s electric power transmission network

            favicon

            (grid.iamkate.com)

            So the new DC will emit about twice as much carbon as all the UK's electricity generation.

            Does the sun not shine in Utah? Does the wind not blow in the desert? Is the climate not changing as fast as the Americans would like? 😡

            #AI #DataCenter #ClimateCrisis

            quixoticgeek@social.v.stQ This user is from outside of this forum
            quixoticgeek@social.v.stQ This user is from outside of this forum
            quixoticgeek@social.v.st
            wrote last edited by
            #7

            @CppGuy you'd need 45km² of solar to generate 9GW or solar, but assuming the sun is only out for a ⅓rd of the time, you'd probably need closer to 135km², plus the battery storage...

            syklemil@snabelen.noS moopet@toot.cafeM 2 Replies Last reply
            0
            • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

              Based on an estimate of 500g CO2/kWh, the one facility would emit ~40MT of CO2 a year. If this one facility was a country, it would rank about 67th, just behind Bulgaria.

              Concentrating this much energy use in a single location is going to change weather patterns. The environmental impact is just mind boggling.

              The AI bubble can't burst soon enough.

              bashstkid@mastodon.onlineB This user is from outside of this forum
              bashstkid@mastodon.onlineB This user is from outside of this forum
              bashstkid@mastodon.online
              wrote last edited by
              #8

              @quixoticgeek Perhaps if the changed weather patterns included a few tornadoes?

              1 Reply Last reply
              0
              • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                Link Preview Image
                New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                The 40,000-acre project will run entirely off-grid using natural gas.

                favicon

                Tom's Hardware (www.tomshardware.com)

                ra@mstdn.socialR This user is from outside of this forum
                ra@mstdn.socialR This user is from outside of this forum
                ra@mstdn.social
                wrote last edited by
                #9

                @quixoticgeek disperse invasive mollusks upstream and use the intake of the plant to 'filter' the water.

                1 Reply Last reply
                0
                • seb1982@norden.socialS seb1982@norden.social

                  @quixoticgeek I would like to bring in a completely different aspect:
                  As the data centre runs entirely on natural gas, sabotaging the whole facility seems to be quite an easy thing to do.

                  P This user is from outside of this forum
                  P This user is from outside of this forum
                  phosphenes@mastodon.social
                  wrote last edited by
                  #10

                  @Seb1982 @quixoticgeek

                  It's a sitting duck for drones.

                  1 Reply Last reply
                  0
                  • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                    Based on an estimate of 500g CO2/kWh, the one facility would emit ~40MT of CO2 a year. If this one facility was a country, it would rank about 67th, just behind Bulgaria.

                    Concentrating this much energy use in a single location is going to change weather patterns. The environmental impact is just mind boggling.

                    The AI bubble can't burst soon enough.

                    freya@social.highenergymagic.netF This user is from outside of this forum
                    freya@social.highenergymagic.netF This user is from outside of this forum
                    freya@social.highenergymagic.net
                    wrote last edited by
                    #11

                    @quixoticgeek lol 9GW, that'll never get built. they can barely get 1GW DCs off the bloody ground, half of them are literally piles of scrap metal and construction trash, last I checked. worst this'll do, funnel a bunch of bloody money to some kind of AI DC construction company that's entirely a scam, and go precisely nowhere.

                    peteriskrisjanis@toot.lvP 1 Reply Last reply
                    0
                    • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                      @CppGuy you'd need 45km² of solar to generate 9GW or solar, but assuming the sun is only out for a ⅓rd of the time, you'd probably need closer to 135km², plus the battery storage...

                      syklemil@snabelen.noS This user is from outside of this forum
                      syklemil@snabelen.noS This user is from outside of this forum
                      syklemil@snabelen.no
                      wrote last edited by
                      #12

                      @quixoticgeek
                      Solar & wind are still cheaper than gas though, so still a weird choice
                      @CppGuy

                      cppguy@infosec.spaceC brokar@mastodon.socialB mihamarkic@mastodon.socialM 3 Replies Last reply
                      0
                      • freya@social.highenergymagic.netF freya@social.highenergymagic.net

                        @quixoticgeek lol 9GW, that'll never get built. they can barely get 1GW DCs off the bloody ground, half of them are literally piles of scrap metal and construction trash, last I checked. worst this'll do, funnel a bunch of bloody money to some kind of AI DC construction company that's entirely a scam, and go precisely nowhere.

                        peteriskrisjanis@toot.lvP This user is from outside of this forum
                        peteriskrisjanis@toot.lvP This user is from outside of this forum
                        peteriskrisjanis@toot.lv
                        wrote last edited by
                        #13

                        @freya @quixoticgeek yeah this pretty much a scam project, considering that AI usage is falling and crash is inevitable

                        lovemakeshare@sunny.gardenL 1 Reply Last reply
                        0
                        • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                          9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                          Link Preview Image
                          New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                          The 40,000-acre project will run entirely off-grid using natural gas.

                          favicon

                          Tom's Hardware (www.tomshardware.com)

                          ferricoxide@blahaj.zoneF This user is from outside of this forum
                          ferricoxide@blahaj.zoneF This user is from outside of this forum
                          ferricoxide@blahaj.zone
                          wrote last edited by
                          #14

                          @quixoticgeek@v.st

                          Sounds not unlike what's going on in the US.

                          Datacenter builders love deserts:

                          * Land is cheap

                          * Large, contiguous chunks of land are easier to come by

                          * Fewer neighbors to contend with

                          * Generally less stuff that needs to be bulldozed to build the datacenter, itself, and the infrastructure that feeds it.

                          quixoticgeek@social.v.stQ marjolica@social.linux.pizzaM 2 Replies Last reply
                          0
                          • ferricoxide@blahaj.zoneF ferricoxide@blahaj.zone

                            @quixoticgeek@v.st

                            Sounds not unlike what's going on in the US.

                            Datacenter builders love deserts:

                            * Land is cheap

                            * Large, contiguous chunks of land are easier to come by

                            * Fewer neighbors to contend with

                            * Generally less stuff that needs to be bulldozed to build the datacenter, itself, and the infrastructure that feeds it.

                            quixoticgeek@social.v.stQ This user is from outside of this forum
                            quixoticgeek@social.v.stQ This user is from outside of this forum
                            quixoticgeek@social.v.st
                            wrote last edited by
                            #15

                            @ferricoxide Utah being in the US. Yes, it's very similar to what's going on in the US...

                            ferricoxide@blahaj.zoneF 1 Reply Last reply
                            0
                            • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                              9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                              Link Preview Image
                              New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                              The 40,000-acre project will run entirely off-grid using natural gas.

                              favicon

                              Tom's Hardware (www.tomshardware.com)

                              mindpersephone@spookygirl.booM This user is from outside of this forum
                              mindpersephone@spookygirl.booM This user is from outside of this forum
                              mindpersephone@spookygirl.boo
                              wrote last edited by
                              #16

                              @quixoticgeek that's ~45 CERNs?! WTF?

                              Forty five of the thing they joked might be able to create a black hole and end the world, in a single site?

                              ~ one Saturn 5 F1 main engine burning constantly for the life time of the site not just a few hundred seconds

                              This is a stupid amount of energy use.

                              mindpersephone@spookygirl.booM 1 Reply Last reply
                              0
                              • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                @ferricoxide Utah being in the US. Yes, it's very similar to what's going on in the US...

                                ferricoxide@blahaj.zoneF This user is from outside of this forum
                                ferricoxide@blahaj.zoneF This user is from outside of this forum
                                ferricoxide@blahaj.zone
                                wrote last edited by
                                #17

                                @quixoticgeek@v.st

                                Oop. I saw the UK mention and didn't see that my instance had hidden the link behind a "more" button. So, assumed reference was to the UK allowing similar idiocy to what's going on in the US.

                                1 Reply Last reply
                                0
                                • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                  Based on an estimate of 500g CO2/kWh, the one facility would emit ~40MT of CO2 a year. If this one facility was a country, it would rank about 67th, just behind Bulgaria.

                                  Concentrating this much energy use in a single location is going to change weather patterns. The environmental impact is just mind boggling.

                                  The AI bubble can't burst soon enough.

                                  woe2you@beige.partyW This user is from outside of this forum
                                  woe2you@beige.partyW This user is from outside of this forum
                                  woe2you@beige.party
                                  wrote last edited by
                                  #18

                                  @quixoticgeek Cast iron proof that it's a boondoggle: they're powering it with fossil fuels because they know the bubble will burst before the TTBE of renewables.

                                  1 Reply Last reply
                                  0
                                  • mindpersephone@spookygirl.booM mindpersephone@spookygirl.boo

                                    @quixoticgeek that's ~45 CERNs?! WTF?

                                    Forty five of the thing they joked might be able to create a black hole and end the world, in a single site?

                                    ~ one Saturn 5 F1 main engine burning constantly for the life time of the site not just a few hundred seconds

                                    This is a stupid amount of energy use.

                                    mindpersephone@spookygirl.booM This user is from outside of this forum
                                    mindpersephone@spookygirl.booM This user is from outside of this forum
                                    mindpersephone@spookygirl.boo
                                    wrote last edited by
                                    #19

                                    @quixoticgeek hang on the thing runs on gas, so an f1 engine gives a vague idea of how much gas its going to need. ~A Saturn five first stage fuel tank every fifteen minutes (rounding to a nice round number)

                                    If you've ever seen a person standing next to a Saturn five you have an idea how utterly absurd an amount of fuel that is.

                                    With out the pipeline that places shuts down. And we thought the back hoe through the fiber link was a bad problem.

                                    profpatsch@mastodon.xyzP 1 Reply Last reply
                                    0
                                    • ferricoxide@blahaj.zoneF ferricoxide@blahaj.zone

                                      @quixoticgeek@v.st

                                      Sounds not unlike what's going on in the US.

                                      Datacenter builders love deserts:

                                      * Land is cheap

                                      * Large, contiguous chunks of land are easier to come by

                                      * Fewer neighbors to contend with

                                      * Generally less stuff that needs to be bulldozed to build the datacenter, itself, and the infrastructure that feeds it.

                                      marjolica@social.linux.pizzaM This user is from outside of this forum
                                      marjolica@social.linux.pizzaM This user is from outside of this forum
                                      marjolica@social.linux.pizza
                                      wrote last edited by
                                      #20

                                      @ferricoxide @quixoticgeek "Datacenter builders love deserts"

                                      ..and deserts usually have such a plentiful supply of water for cooling.

                                      Presumably they will take the water from Lake Powell?

                                      Link Preview Image
                                      The costs of surging water into drought-depleted Lake Powell will be widespread

                                      Lake Powell is at just 23% capacity and approaching the point where water won't be able to flow into its hydroelectric turbines without air causing damage.

                                      favicon

                                      KUER (www.kuer.org)

                                      1 Reply Last reply
                                      0
                                      • syklemil@snabelen.noS syklemil@snabelen.no

                                        @quixoticgeek
                                        Solar & wind are still cheaper than gas though, so still a weird choice
                                        @CppGuy

                                        cppguy@infosec.spaceC This user is from outside of this forum
                                        cppguy@infosec.spaceC This user is from outside of this forum
                                        cppguy@infosec.space
                                        wrote last edited by
                                        #21

                                        @syklemil @quixoticgeek

                                        They're building the thing in a desert, i.e. an expanse of unused space. If they had to build this monstrosity at all, they could have used some of that space for renewable energy generation.

                                        1 Reply Last reply
                                        0
                                        • syklemil@snabelen.noS syklemil@snabelen.no

                                          @quixoticgeek
                                          Solar & wind are still cheaper than gas though, so still a weird choice
                                          @CppGuy

                                          brokar@mastodon.socialB This user is from outside of this forum
                                          brokar@mastodon.socialB This user is from outside of this forum
                                          brokar@mastodon.social
                                          wrote last edited by
                                          #22

                                          @syklemil @quixoticgeek @CppGuy

                                          They will be building power plants for that because no state has 9GW power lying around or spare, not even talking about the cables and infrastructure you'd need to even get the energy there.
                                          And since this is a desert, i assume there isn't much water around for cooling.
                                          Also, i can only guess the number of backup generators they'd need to secure operation. Gas powered of course. And are they talking about carbon neutrality? Being the good greenwashing company?

                                          1 Reply Last reply
                                          0
                                          Reply
                                          • Reply as topic
                                          Log in to reply
                                          • Oldest to Newest
                                          • Newest to Oldest
                                          • Most Votes


                                          • Login

                                          • Login or register to search.
                                          • First post
                                            Last post
                                          0
                                          • Categories
                                          • Recent
                                          • Tags
                                          • Popular
                                          • World
                                          • Users
                                          • Groups