MaineDOT to Work on Route 26 — 04/14/2026 08:53 AM EDT
Uncategorized
1
Posts
1
Posters
1
Views
-
MaineDOT to Work on Route 26 — 04/14/2026 08:53 AM EDT
FALMOUTH/PORTLAND - April 14, 2026 -Starting on April 20, the Maine Department of Transportation will be working on Route 26 for a highway preservation project.
There will be one-way alternating traffic controlled by flaggers between 6AM and 7PM up to 500 feet. Longer one-way flagger-controlled traffic closures will be conducted between 7PM and 6AM. The work begins at Lyseth Moore Drive in Portla…
#Maine #Traffic -
R relay@relay.mycrowd.ca shared this topic