Skip to content
  • Categories
  • Recent
  • Tags
  • Popular
  • World
  • Users
  • Groups
Skins
  • Light
  • Brite
  • Cerulean
  • Cosmo
  • Flatly
  • Journal
  • Litera
  • Lumen
  • Lux
  • Materia
  • Minty
  • Morph
  • Pulse
  • Sandstone
  • Simplex
  • Sketchy
  • Spacelab
  • United
  • Yeti
  • Zephyr
  • Dark
  • Cyborg
  • Darkly
  • Quartz
  • Slate
  • Solar
  • Superhero
  • Vapor

  • Default (Cyborg)
  • No Skin
Collapse
Brand Logo

CIRCLE WITH A DOT

  1. Home
  2. Uncategorized
  3. 9GW datacentre approved.

9GW datacentre approved.

Scheduled Pinned Locked Moved Uncategorized
109 Posts 68 Posters 0 Views
  • Oldest to Newest
  • Newest to Oldest
  • Most Votes
Reply
  • Reply as topic
Log in to reply
This topic has been deleted. Only users with topic management privileges can see it.
  • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

    9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

    Link Preview Image
    New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

    The 40,000-acre project will run entirely off-grid using natural gas.

    favicon

    Tom's Hardware (www.tomshardware.com)

    scm@sfba.socialS This user is from outside of this forum
    scm@sfba.socialS This user is from outside of this forum
    scm@sfba.social
    wrote last edited by
    #83

    @quixoticgeek According to Wikipedia: “In 2024, Utah had a total summer capacity of 10.3 GW through all of its power plants”

    So it’s going to basically use the equivalent of all the power generated in Utah

    1 Reply Last reply
    0
    • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

      9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

      Link Preview Image
      New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

      The 40,000-acre project will run entirely off-grid using natural gas.

      favicon

      Tom's Hardware (www.tomshardware.com)

      dougfir@m.ai6yr.orgD This user is from outside of this forum
      dougfir@m.ai6yr.orgD This user is from outside of this forum
      dougfir@m.ai6yr.org
      wrote last edited by
      #84

      @quixoticgeek
      Did you also note the proposed site is served by one 2 lane road? Back when they were building the natural gas pipeline, the one 6 room motel in the area was pretty busy. All other workers had to drive about 1½ hours from any sort of accommodation.

      dougfir@m.ai6yr.orgD 1 Reply Last reply
      0
      • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

        9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

        Link Preview Image
        New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

        The 40,000-acre project will run entirely off-grid using natural gas.

        favicon

        Tom's Hardware (www.tomshardware.com)

        wtarbiat@mastodon.socialW This user is from outside of this forum
        wtarbiat@mastodon.socialW This user is from outside of this forum
        wtarbiat@mastodon.social
        wrote last edited by
        #85

        @quixoticgeek may not even get built lol.

        1 Reply Last reply
        0
        • vatvslpr@c.imV vatvslpr@c.im

          @TimWardCam @quixoticgeek
          I don't know if the AI boom was designed specifically to justify building a bunch more fossil fuel powered generating capacity, but that sure looks like it's an effect. It stinks, because building a ton of renewable power would be a nice consolation prize for the AI boom collapsing.

          rupert@mastodon.nzR This user is from outside of this forum
          rupert@mastodon.nzR This user is from outside of this forum
          rupert@mastodon.nz
          wrote last edited by
          #86

          @VATVSLPR @TimWardCam @quixoticgeek It's who's funding it.

          timwardcam@c.imT 1 Reply Last reply
          0
          • ehproque@neopaquita.esE ehproque@neopaquita.es

            @quixoticgeek how much water then? Where's it coming from?

            dougfir@m.ai6yr.orgD This user is from outside of this forum
            dougfir@m.ai6yr.orgD This user is from outside of this forum
            dougfir@m.ai6yr.org
            wrote last edited by
            #87

            @ehproque @quixoticgeek
            They claim they will pump groundwater, purify it because it is too salty as is, then send the hot water to the Great Salt Lake. This site is a long ways from the Colorado River.
            There is ample area out the covered only in salt grass to install enough solar power including batteries for nights and cloudy days to power the entire united states, let alone some data centers.

            1 Reply Last reply
            0
            • rupert@mastodon.nzR rupert@mastodon.nz

              @VATVSLPR @TimWardCam @quixoticgeek It's who's funding it.

              timwardcam@c.imT This user is from outside of this forum
              timwardcam@c.imT This user is from outside of this forum
              timwardcam@c.im
              wrote last edited by
              #88

              @rupert @VATVSLPR @quixoticgeek I wonder how all 680 miles of that pipeline are going to be defended 24/7?

              The rest of the world - and plenty of Americans - would have good reason for blowing it up. Although ... the USA has decided that the new world order is that you can just bomb the shit out of whoever and whatever you like without bothering to think of a justification, so that's even easier.

              1 Reply Last reply
              0
              • lovemakeshare@sunny.gardenL lovemakeshare@sunny.garden

                @jpaskaruk @peteriskrisjanis @freya @quixoticgeek Not the *specific* words I would have used, but yes.

                Did you know he acquired and killed The Learning Company so hard it almost took down Mattel? And maybe took the whole edutainment software industry with it? 'member that? Pepperidge Farms remembers.

                Link Preview Image
                SoftKey - Wikipedia

                favicon

                (en.wikipedia.org)

                jpaskaruk@growers.socialJ This user is from outside of this forum
                jpaskaruk@growers.socialJ This user is from outside of this forum
                jpaskaruk@growers.social
                wrote last edited by
                #89

                @lovemakeshare @peteriskrisjanis @freya @quixoticgeek I remember TLC. It was a good thing.

                the Usian prez is an affront to all humanity of course, but he can't elicit the visceral hate that an O'Leary or a Nygard can. The rage is much stronger when they come from where you are.

                Starmer being a notable exception. He's like, if Superman was a Golgothan Shit Demon, Starmer is Clark Kent.

                1 Reply Last reply
                0
                • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                  9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                  Link Preview Image
                  New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                  The 40,000-acre project will run entirely off-grid using natural gas.

                  favicon

                  Tom's Hardware (www.tomshardware.com)

                  stevo618@mastodon.socialS This user is from outside of this forum
                  stevo618@mastodon.socialS This user is from outside of this forum
                  stevo618@mastodon.social
                  wrote last edited by
                  #90

                  @quixoticgeek Kind of insane!

                  1 Reply Last reply
                  0
                  • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                    9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                    Link Preview Image
                    New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                    The 40,000-acre project will run entirely off-grid using natural gas.

                    favicon

                    Tom's Hardware (www.tomshardware.com)

                    libertyforward1@beige.partyL This user is from outside of this forum
                    libertyforward1@beige.partyL This user is from outside of this forum
                    libertyforward1@beige.party
                    wrote last edited by
                    #91

                    @quixoticgeek 🤦‍♂️ I grew up in this county. Almost all of my family lives in this county.

                    1 Reply Last reply
                    0
                    • syklemil@snabelen.noS syklemil@snabelen.no

                      @quixoticgeek
                      Solar & wind are still cheaper than gas though, so still a weird choice
                      @CppGuy

                      mihamarkic@mastodon.socialM This user is from outside of this forum
                      mihamarkic@mastodon.socialM This user is from outside of this forum
                      mihamarkic@mastodon.social
                      wrote last edited by
                      #92

                      @syklemil @quixoticgeek @CppGuy Batteries are not, though.

                      1 Reply Last reply
                      0
                      • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                        9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                        Link Preview Image
                        New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                        The 40,000-acre project will run entirely off-grid using natural gas.

                        favicon

                        Tom's Hardware (www.tomshardware.com)

                        brouhaha@mastodon.socialB This user is from outside of this forum
                        brouhaha@mastodon.socialB This user is from outside of this forum
                        brouhaha@mastodon.social
                        wrote last edited by
                        #93

                        @quixoticgeek
                        That biosphere won't just destroy itself, you know.

                        1 Reply Last reply
                        0
                        • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                          9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                          Link Preview Image
                          New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                          The 40,000-acre project will run entirely off-grid using natural gas.

                          favicon

                          Tom's Hardware (www.tomshardware.com)

                          mira@shark.communityM This user is from outside of this forum
                          mira@shark.communityM This user is from outside of this forum
                          mira@shark.community
                          wrote last edited by
                          #94

                          @quixoticgeek Not to mention the water that it will require, in state that is in sever drought and whose great salt lake is evaporating away

                          1 Reply Last reply
                          0
                          • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                            9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                            Link Preview Image
                            New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                            The 40,000-acre project will run entirely off-grid using natural gas.

                            favicon

                            Tom's Hardware (www.tomshardware.com)

                            wesdym@mastodon.socialW This user is from outside of this forum
                            wesdym@mastodon.socialW This user is from outside of this forum
                            wesdym@mastodon.social
                            wrote last edited by
                            #95

                            @quixoticgeek Utah brought this on themselves, by stupidly electing the kinds of assholes who'd greenlight something like this. My sympathy is limited.

                            Why this location, I don't know. Maybe the land was cheap. But a lax regulatory environment was undoubtedly a factor.

                            1 Reply Last reply
                            0
                            • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                              9GW datacentre approved. I'm trying to get my head round the scale of this. The whole of the UK uses about 40GW of electricity. So this one facility is a quarter of the UK grid. In one location. I had to look up box elder county on Wikipedia. "Its territory includes large tracts of barren desert,". Right, so a datacentre that uses the same amount of electricity as a quarter of the UK. In a fucking desert. And that's before we even consider the CO2 emissions. Yikes.

                              Link Preview Image
                              New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses — Kevin O'Leary's 9 Gigawatt Utah data center campus approved

                              The 40,000-acre project will run entirely off-grid using natural gas.

                              favicon

                              Tom's Hardware (www.tomshardware.com)

                              huntingdon@mstdn.socialH This user is from outside of this forum
                              huntingdon@mstdn.socialH This user is from outside of this forum
                              huntingdon@mstdn.social
                              wrote last edited by
                              #96

                              @quixoticgeek

                              It's a cinch that new 9 gw AI software data center in Utah won't be used to process your credit card purchases -- except as part of processing your entire personal file.

                              1 Reply Last reply
                              0
                              • dougfir@m.ai6yr.orgD dougfir@m.ai6yr.org

                                @quixoticgeek
                                Did you also note the proposed site is served by one 2 lane road? Back when they were building the natural gas pipeline, the one 6 room motel in the area was pretty busy. All other workers had to drive about 1½ hours from any sort of accommodation.

                                dougfir@m.ai6yr.orgD This user is from outside of this forum
                                dougfir@m.ai6yr.orgD This user is from outside of this forum
                                dougfir@m.ai6yr.org
                                wrote last edited by
                                #97

                                @quixoticgeek
                                I also note they want to use about 40,000 acres for this project. Google tells me it takes between 4-8,000 acres to produce 1 gigawatt of power. So they are claiming enough property to use solar power for the whole project.
                                They might claim there is no producer able to make that many solar panels. But they have also not explained how they will source that much gas or steam turbine generating capacity.

                                1 Reply Last reply
                                0
                                • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                  @mycotropic @ehproque

                                  That's why the Colorado river never makes it as far as the sea. The whole river gets stolen.

                                  https://youtu.be/_0U0YWsuFpU?

                                  wesdym@mastodon.socialW This user is from outside of this forum
                                  wesdym@mastodon.socialW This user is from outside of this forum
                                  wesdym@mastodon.social
                                  wrote last edited by
                                  #98

                                  @quixoticgeek I'm not a small child. Is there a version of this made for grown-ups?

                                  quixoticgeek@social.v.stQ 1 Reply Last reply
                                  0
                                  • wesdym@mastodon.socialW wesdym@mastodon.social

                                    @quixoticgeek I'm not a small child. Is there a version of this made for grown-ups?

                                    quixoticgeek@social.v.stQ This user is from outside of this forum
                                    quixoticgeek@social.v.stQ This user is from outside of this forum
                                    quixoticgeek@social.v.st
                                    wrote last edited by
                                    #99

                                    @wesdym https://en.wikipedia.org/wiki/Colorado_River

                                    This one ?

                                    wesdym@mastodon.socialW 1 Reply Last reply
                                    0
                                    • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                      @wesdym https://en.wikipedia.org/wiki/Colorado_River

                                      This one ?

                                      wesdym@mastodon.socialW This user is from outside of this forum
                                      wesdym@mastodon.socialW This user is from outside of this forum
                                      wesdym@mastodon.social
                                      wrote last edited by
                                      #100

                                      @quixoticgeek I'm talking about the video you linked. It's childish.

                                      quixoticgeek@social.v.stQ 1 Reply Last reply
                                      0
                                      • wesdym@mastodon.socialW wesdym@mastodon.social

                                        @quixoticgeek I'm talking about the video you linked. It's childish.

                                        quixoticgeek@social.v.stQ This user is from outside of this forum
                                        quixoticgeek@social.v.stQ This user is from outside of this forum
                                        quixoticgeek@social.v.st
                                        wrote last edited by
                                        #101

                                        @wesdym it's a half as interesting YouTube video. What else do you expect

                                        wesdym@mastodon.socialW 1 Reply Last reply
                                        0
                                        • quixoticgeek@social.v.stQ quixoticgeek@social.v.st

                                          @wesdym it's a half as interesting YouTube video. What else do you expect

                                          wesdym@mastodon.socialW This user is from outside of this forum
                                          wesdym@mastodon.socialW This user is from outside of this forum
                                          wesdym@mastodon.social
                                          wrote last edited by
                                          #102

                                          @quixoticgeek You know what? I'm really just kind of done with your stupid childish shit at this point. You make ignorant remarks, link childish sources, make vague and meaningless excuses, and you write like fucking child. Bye.

                                          1 Reply Last reply
                                          0
                                          Reply
                                          • Reply as topic
                                          Log in to reply
                                          • Oldest to Newest
                                          • Newest to Oldest
                                          • Most Votes


                                          • Login

                                          • Login or register to search.
                                          • First post
                                            Last post
                                          0
                                          • Categories
                                          • Recent
                                          • Tags
                                          • Popular
                                          • World
                                          • Users
                                          • Groups