<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0"><channel><title><![CDATA[good news, Ontario just announced the first round of LT2 contract awards]]></title><description><![CDATA[<p>good news, Ontario just announced the first round of LT2 contract awards</p><p>if all these projects go ahead, we'll add 915 MW of solar and 400 MW of wind to the Ontario grid.  a huge expansion for solar in particular <img
      src="https://board.circlewithadot.net/assets/plugins/nodebb-plugin-emoji/emoji/android/1f31e.png?v=28325c671da"
      class="not-responsive emoji emoji-android emoji--sun_with_face"
      style="height: 23px; width: auto; vertical-align: middle;"
      title="🌞"
      alt="🌞"
    /><img
      src="https://board.circlewithadot.net/assets/plugins/nodebb-plugin-emoji/emoji/android/1f50c.png?v=28325c671da"
      class="not-responsive emoji emoji-android emoji--electric_plug"
      style="height: 23px; width: auto; vertical-align: middle;"
      title="🔌"
      alt="🔌"
    /> </p><p><a href="https://ieso.ca/-/media/Files/IESO/Document-Library/long-term-rfp/energy/LT2e-1-20260409-Public-Result-Table.pdf" rel="nofollow noopener noreferrer"><span>https://</span><span>ieso.ca/-/media/Files/IESO/Doc</span><span>ument-Library/long-term-rfp/energy/LT2e-1-20260409-Public-Result-Table.pdf</span></a></p>]]></description><link>https://board.circlewithadot.net/topic/ac328e31-06ce-4475-8320-d28a659d2a0b/good-news-ontario-just-announced-the-first-round-of-lt2-contract-awards</link><generator>RSS for Node</generator><lastBuildDate>Sat, 18 Apr 2026 03:58:49 GMT</lastBuildDate><atom:link href="https://board.circlewithadot.net/topic/ac328e31-06ce-4475-8320-d28a659d2a0b.rss" rel="self" type="application/rss+xml"/><pubDate>Fri, 10 Apr 2026 19:04:49 GMT</pubDate><ttl>60</ttl><item><title><![CDATA[Reply to good news, Ontario just announced the first round of LT2 contract awards on Fri, 10 Apr 2026 21:09:16 GMT]]></title><description><![CDATA[<p><span><a href="/user/shadowspar%40ottawa.place">@<span>shadowspar</span></a></span> </p><p>I'm not entirely sure - my dad is a town counselor for the township of Armor, but my sister told me about the state of one of the sites, I was pretty sure it was the East site, as it's by/around the church down the road from my parents, I don't know what her source was.</p><p>I did send her the northland power link and asked about it, but she may be talking about the Peggs mountain road site.</p><p>I have family that work (currently and formerly) within OPG and HydroOne, so I could likely find out.</p>]]></description><link>https://board.circlewithadot.net/post/https://mstdn.ca/users/crabbypup/statuses/116382456649637839</link><guid isPermaLink="true">https://board.circlewithadot.net/post/https://mstdn.ca/users/crabbypup/statuses/116382456649637839</guid><dc:creator><![CDATA[crabbypup@mstdn.ca]]></dc:creator><pubDate>Fri, 10 Apr 2026 21:09:16 GMT</pubDate></item><item><title><![CDATA[Reply to good news, Ontario just announced the first round of LT2 contract awards on Fri, 10 Apr 2026 20:57:49 GMT]]></title><description><![CDATA[<p><span><a href="/user/crabbypup%40mstdn.ca">@<span>crabbypup</span></a></span> which site is that?  I see Northland Power lists the Burks Falls East &amp; West projects as operational, being commissioned in 2013 and 2014.  and there's another smaller site on Peggs Mountain Rd that also sounds like it's up &amp; running (though currently embroiled in a fight over installing a BESS)</p><p><div class="card col-md-9 col-lg-6 position-relative link-preview p-0">



<a href="https://www.northlandpower.com/en/assets-and-infrastructure/canadian-solar.aspx" title="Canadian Solar">
<img src="https://www.northlandpower.com/en/images/structure/news_avatar.jpg" class="card-img-top not-responsive" style="max-height: 15rem;" alt="Link Preview Image" />
</a>



<div class="card-body">
<h5 class="card-title">
<a href="https://www.northlandpower.com/en/assets-and-infrastructure/canadian-solar.aspx">
Canadian Solar
</a>
</h5>
<p class="card-text line-clamp-3"></p>
</div>
<a href="https://www.northlandpower.com/en/assets-and-infrastructure/canadian-solar.aspx" class="card-footer text-body-secondary small d-flex gap-2 align-items-center lh-2">



<img src="https://www.northlandpower.com/favicon-32x32.png" alt="favicon" class="not-responsive overflow-hiddden" style="max-width: 21px; max-height: 21px;" />







<p class="d-inline-block text-truncate mb-0"> <span class="text-secondary">(www.northlandpower.com)</span></p>
</a>
</div></p><p><div class="card col-md-9 col-lg-6 position-relative link-preview p-0">



<a href="https://powerbankcorp.com/bess-township-of-armour/" title="BESS Township of Armour - PowerBank Corporation">
<img src="https://powerbankcorp.com/wp-content/uploads/PowerBank-Logo-Transparent-Background-e1753714651914.png" class="card-img-top not-responsive" style="max-height: 15rem;" alt="Link Preview Image" />
</a>







<div class="card-body">
<h5 class="card-title">
<a href="https://powerbankcorp.com/bess-township-of-armour/">
BESS Township of Armour - PowerBank Corporation
</a>
</h5>
<p class="card-text line-clamp-3">PowerBank's 5MW/20MWh energy storage system in Armour Township. Once operational IESO-contracted project enhances grid reliability & supports Ontario's energy.</p>
</div>
<a href="https://powerbankcorp.com/bess-township-of-armour/" class="card-footer text-body-secondary small d-flex gap-2 align-items-center lh-2">



<img src="https://powerbankcorp.com/wp-content/uploads/favicon-1.svg" alt="favicon" class="not-responsive overflow-hiddden" style="max-width: 21px; max-height: 21px;" />







<p class="d-inline-block text-truncate mb-0">Powerbank Corporation - We are an established and trusted developer, engineer, builder, and asset operator in the economy-wide pursuit of Net-Zero carbon emissions. <span class="text-secondary">(powerbankcorp.com)</span></p>
</a>
</div></p>]]></description><link>https://board.circlewithadot.net/post/https://ottawa.place/users/shadowspar/statuses/116382411640794341</link><guid isPermaLink="true">https://board.circlewithadot.net/post/https://ottawa.place/users/shadowspar/statuses/116382411640794341</guid><dc:creator><![CDATA[shadowspar@ottawa.place]]></dc:creator><pubDate>Fri, 10 Apr 2026 20:57:49 GMT</pubDate></item><item><title><![CDATA[Reply to good news, Ontario just announced the first round of LT2 contract awards on Fri, 10 Apr 2026 19:23:23 GMT]]></title><description><![CDATA[<p><span><a href="/user/shadowspar%40ottawa.place">@<span>shadowspar</span></a></span> </p><p>Wonder if they'll finally bring the Burks falls solar plant online, which has been finished and ready, but not actually connected to the grid since the ontario government cancelled the contract a week from the date it was supposed to be connected.</p>]]></description><link>https://board.circlewithadot.net/post/https://mstdn.ca/users/crabbypup/statuses/116382040269284438</link><guid isPermaLink="true">https://board.circlewithadot.net/post/https://mstdn.ca/users/crabbypup/statuses/116382040269284438</guid><dc:creator><![CDATA[crabbypup@mstdn.ca]]></dc:creator><pubDate>Fri, 10 Apr 2026 19:23:23 GMT</pubDate></item></channel></rss>