<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0"><channel><title><![CDATA[An FYI to all Edmonton folks:The High-Level Bridge is closed for roadwork overnight this week, 9:30pm to 6am.]]></title><description><![CDATA[<p>An FYI to all Edmonton folks:<br />The High-Level Bridge is closed for roadwork overnight this week, 9:30pm to 6am. Started yesterday, the website says it's supposed to be back to normal by Thursday. (which is a relief, there was no end date on the construction signs!)</p><p>This means that the southbound #9 bus is detouring to take the Groat Road bridge. All #9 buses will likely be way off schedule after 10pm.</p><p>The bus I took home last night had extra trouble because there is <em>also</em> a construction road closure on 100 Ave west of 109 St, on the buses' usual detour route. Detours on detours!</p><p>The driver ended up in a dead end, talking on the radio to try to figure out an alternate route, then asked if someone could get off &amp; spot him as he tried to do a left turn in reverse to redirect. But my awkward waving was not enough to help him make that manouever. <img src="https://board.circlewithadot.net/assets/plugins/nodebb-plugin-emoji/emoji/android/1f62c.png?v=28325c671da" class="not-responsive emoji emoji-android emoji--grimacing" style="height:23px;width:auto;vertical-align:middle" title="😬" alt="😬" /> He eventually took a loop around which included squeezing down a single lane with scaffolding taking up the other side of the street.</p><p><a href="https://mstdn.ca/tags/YEG" rel="tag">#<span>YEG</span></a> <a href="https://mstdn.ca/tags/YEGtransit" rel="tag">#<span>YEGtransit</span></a></p>]]></description><link>https://board.circlewithadot.net/topic/8e21291e-ee95-4991-af2e-12724d06d5dd/an-fyi-to-all-edmonton-folks-the-high-level-bridge-is-closed-for-roadwork-overnight-this-week-9-30pm-to-6am.</link><generator>RSS for Node</generator><lastBuildDate>Fri, 15 May 2026 08:26:53 GMT</lastBuildDate><atom:link href="https://board.circlewithadot.net/topic/8e21291e-ee95-4991-af2e-12724d06d5dd.rss" rel="self" type="application/rss+xml"/><pubDate>Tue, 05 May 2026 18:10:32 GMT</pubDate><ttl>60</ttl></channel></rss>