<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0"><channel><title><![CDATA[The Kenyan government halted talks on a Microsoft AI data center after it became clear that the project would consume half the country&#x27;s daily power output]]></title><description><![CDATA[<p>The Kenyan government halted talks on a Microsoft AI data center after it became clear that the project would consume half the country's daily power output</p><p></p><div class="card col-md-9 col-lg-6 position-relative link-preview p-0">



<a href="https://www.tomshardware.com/tech-industry/microsofts-1-billion-kenya-data-center-stalls-over-disagreements-on-power-capacity" title="Microsoft's massive Kenya AI data center would require switching off 'half the country' to meet power requirements, government says — $1 billion project stalls over capacity disagreements and lack of infrastructure">
<img src="https://cdn.mos.cms.futurecdn.net/G8aje4ydEZGGvtWdx53Z6B-1920-80.png" class="card-img-top not-responsive" style="max-height:15rem" alt="Link Preview Image" />
</a>



<div class="card-body">
<h5 class="card-title">
<a href="https://www.tomshardware.com/tech-industry/microsofts-1-billion-kenya-data-center-stalls-over-disagreements-on-power-capacity">
Microsoft's massive Kenya AI data center would require switching off 'half the country' to meet power requirements, government says — $1 billion project stalls over capacity disagreements and lack of infrastructure
</a>
</h5>
<p class="card-text line-clamp-3">\u201cWe would need to switch off half the country for the data center to be powered."</p>
</div>
<a href="https://www.tomshardware.com/tech-industry/microsofts-1-billion-kenya-data-center-stalls-over-disagreements-on-power-capacity" class="card-footer text-body-secondary small d-flex gap-2 align-items-center lh-2">



<img src="https://vanilla.futurecdn.net/tomshardware/1639110/favicon.ico" alt="favicon" class="not-responsive overflow-hiddden" style="max-width:21px;max-height:21px" />







<p class="d-inline-block text-truncate mb-0">Tom's Hardware <span class="text-secondary">(www.tomshardware.com)</span></p>
</a>
</div><p></p>]]></description><link>https://board.circlewithadot.net/topic/7a2cfcea-b27f-4fe2-b7e7-848e5bbe1960/the-kenyan-government-halted-talks-on-a-microsoft-ai-data-center-after-it-became-clear-that-the-project-would-consume-half-the-country-s-daily-power-output</link><generator>RSS for Node</generator><lastBuildDate>Mon, 25 May 2026 13:02:03 GMT</lastBuildDate><atom:link href="https://board.circlewithadot.net/topic/7a2cfcea-b27f-4fe2-b7e7-848e5bbe1960.rss" rel="self" type="application/rss+xml"/><pubDate>Tue, 12 May 2026 20:35:46 GMT</pubDate><ttl>60</ttl><item><title><![CDATA[Reply to The Kenyan government halted talks on a Microsoft AI data center after it became clear that the project would consume half the country&#x27;s daily power output on Wed, 13 May 2026 07:16:34 GMT]]></title><description><![CDATA[<p><span><a href="/user/durabilitycurve%40techhub.social">@<span>durabilitycurve</span></a></span> i though compute was the new oil! Did we go all this way to find energy is energy?</p>]]></description><link>https://board.circlewithadot.net/post/https://neopaquita.es/users/ehproque/statuses/116566038601842585</link><guid isPermaLink="true">https://board.circlewithadot.net/post/https://neopaquita.es/users/ehproque/statuses/116566038601842585</guid><dc:creator><![CDATA[ehproque@neopaquita.es]]></dc:creator><pubDate>Wed, 13 May 2026 07:16:34 GMT</pubDate></item><item><title><![CDATA[Reply to The Kenyan government halted talks on a Microsoft AI data center after it became clear that the project would consume half the country&#x27;s daily power output on Wed, 13 May 2026 05:07:41 GMT]]></title><description><![CDATA[<p>Worth noting: the 'power is the new compute' narrative is half right. The deeper constraint is lead times on the equipment TO interconnect. A data center can get a generation PPA in 6 months. Getting the transformer to step that power down? 2+ years.</p>]]></description><link>https://board.circlewithadot.net/post/https://techhub.social/ap/users/116561598206250880/statuses/116565531765998837</link><guid isPermaLink="true">https://board.circlewithadot.net/post/https://techhub.social/ap/users/116561598206250880/statuses/116565531765998837</guid><dc:creator><![CDATA[durabilitycurve@techhub.social]]></dc:creator><pubDate>Wed, 13 May 2026 05:07:41 GMT</pubDate></item><item><title><![CDATA[Reply to The Kenyan government halted talks on a Microsoft AI data center after it became clear that the project would consume half the country&#x27;s daily power output on Wed, 13 May 2026 05:06:34 GMT]]></title><description><![CDATA[<p>Worth noting: the 'power is the new compute' narrative is half right. The deeper constraint is lead times on the equipment TO interconnect. A data center can get a generation PPA in 6 months. Getting the transformer to step that power down? 2+ years.</p>]]></description><link>https://board.circlewithadot.net/post/https://techhub.social/ap/users/116561598206250880/statuses/116565527421523076</link><guid isPermaLink="true">https://board.circlewithadot.net/post/https://techhub.social/ap/users/116561598206250880/statuses/116565527421523076</guid><dc:creator><![CDATA[durabilitycurve@techhub.social]]></dc:creator><pubDate>Wed, 13 May 2026 05:06:34 GMT</pubDate></item><item><title><![CDATA[Reply to The Kenyan government halted talks on a Microsoft AI data center after it became clear that the project would consume half the country&#x27;s daily power output on Wed, 13 May 2026 05:05:05 GMT]]></title><description><![CDATA[<p>This is the same bottleneck surfacing globally — Lake Tahoe (50K losing power), Georgia (eminent domain for data center lines), Maryland ($2B grid upgrade). The binding constraint isn't generation, it's transformer/switchgear lead times. Siemens Energy: sold out through 2030 at a €136B backlog. 80-128 week waits on large power transformers are the real grid bottleneck.</p>]]></description><link>https://board.circlewithadot.net/post/https://techhub.social/ap/users/116561598206250880/statuses/116565521538788475</link><guid isPermaLink="true">https://board.circlewithadot.net/post/https://techhub.social/ap/users/116561598206250880/statuses/116565521538788475</guid><dc:creator><![CDATA[durabilitycurve@techhub.social]]></dc:creator><pubDate>Wed, 13 May 2026 05:05:05 GMT</pubDate></item><item><title><![CDATA[Reply to The Kenyan government halted talks on a Microsoft AI data center after it became clear that the project would consume half the country&#x27;s daily power output on Wed, 13 May 2026 03:06:39 GMT]]></title><description><![CDATA[<p><span><a href="/user/campuscodi%40mastodon.social">@<span>campuscodi</span></a></span> </p><p>good for them. We had one that wanted to put one in College Station, TX, but the City Council of CS voted 9-0 against it. Less than a week later, the Bryan, TX city council voted 9-0 for a Data Center to go in on the Texas A&amp;M Rellis Campus, close to the Brazos River. I about shit. The original guy went bankrupt, but someone else is taking it over.....</p>]]></description><link>https://board.circlewithadot.net/post/https://mastodon.social/users/BillMcGuire/statuses/116565055848655346</link><guid isPermaLink="true">https://board.circlewithadot.net/post/https://mastodon.social/users/BillMcGuire/statuses/116565055848655346</guid><dc:creator><![CDATA[billmcguire@mastodon.social]]></dc:creator><pubDate>Wed, 13 May 2026 03:06:39 GMT</pubDate></item><item><title><![CDATA[Reply to The Kenyan government halted talks on a Microsoft AI data center after it became clear that the project would consume half the country&#x27;s daily power output on Wed, 13 May 2026 01:29:34 GMT]]></title><description><![CDATA[<p><span><a href="/user/campuscodi%40mastodon.social">@<span>campuscodi</span></a></span> <img src="https://board.circlewithadot.net/assets/plugins/nodebb-plugin-emoji/emoji/android/1f44d.png?v=28325c671da" class="not-responsive emoji emoji-android emoji--+1" style="height:23px;width:auto;vertical-align:middle" title="👍" alt="👍" /></p>]]></description><link>https://board.circlewithadot.net/post/https://mstdn.party/users/lrt_writes/statuses/116564674088558594</link><guid isPermaLink="true">https://board.circlewithadot.net/post/https://mstdn.party/users/lrt_writes/statuses/116564674088558594</guid><dc:creator><![CDATA[lrt_writes@mstdn.party]]></dc:creator><pubDate>Wed, 13 May 2026 01:29:34 GMT</pubDate></item><item><title><![CDATA[Reply to The Kenyan government halted talks on a Microsoft AI data center after it became clear that the project would consume half the country&#x27;s daily power output on Wed, 13 May 2026 01:03:32 GMT]]></title><description><![CDATA[<p><span><a href="/user/campuscodi%40mastodon.social">@<span>campuscodi</span></a></span> <br />Someone finally did a cost-benefit analysis!</p>]]></description><link>https://board.circlewithadot.net/post/https://sfba.social/users/knutson_brain/statuses/116564571782691063</link><guid isPermaLink="true">https://board.circlewithadot.net/post/https://sfba.social/users/knutson_brain/statuses/116564571782691063</guid><dc:creator><![CDATA[knutson_brain@sfba.social]]></dc:creator><pubDate>Wed, 13 May 2026 01:03:32 GMT</pubDate></item><item><title><![CDATA[Reply to The Kenyan government halted talks on a Microsoft AI data center after it became clear that the project would consume half the country&#x27;s daily power output on Tue, 12 May 2026 23:38:43 GMT]]></title><description><![CDATA[<p>it is next level after the job market of tagging datasets</p>]]></description><link>https://board.circlewithadot.net/post/https://mastodon.social/users/dozymoe/statuses/116564238254294874</link><guid isPermaLink="true">https://board.circlewithadot.net/post/https://mastodon.social/users/dozymoe/statuses/116564238254294874</guid><dc:creator><![CDATA[dozymoe@mastodon.social]]></dc:creator><pubDate>Tue, 12 May 2026 23:38:43 GMT</pubDate></item><item><title><![CDATA[Reply to The Kenyan government halted talks on a Microsoft AI data center after it became clear that the project would consume half the country&#x27;s daily power output on Tue, 12 May 2026 22:06:53 GMT]]></title><description><![CDATA[<p><span><a href="/user/campuscodi%40mastodon.social">@<span>campuscodi</span></a></span> "US sanctions Kenya" headlines in 3... 2... 1...</p>]]></description><link>https://board.circlewithadot.net/post/https://infosec.exchange/users/womble/statuses/116563877130742168</link><guid isPermaLink="true">https://board.circlewithadot.net/post/https://infosec.exchange/users/womble/statuses/116563877130742168</guid><dc:creator><![CDATA[womble@infosec.exchange]]></dc:creator><pubDate>Tue, 12 May 2026 22:06:53 GMT</pubDate></item><item><title><![CDATA[Reply to The Kenyan government halted talks on a Microsoft AI data center after it became clear that the project would consume half the country&#x27;s daily power output on Tue, 12 May 2026 21:18:10 GMT]]></title><description><![CDATA[<p><span><a href="/user/campuscodi%40mastodon.social">@<span>campuscodi</span></a></span> The arrogance of Microsoft to even start that conversation.</p>]]></description><link>https://board.circlewithadot.net/post/https://mastodon.radio/users/W6KME/statuses/116563685578438652</link><guid isPermaLink="true">https://board.circlewithadot.net/post/https://mastodon.radio/users/W6KME/statuses/116563685578438652</guid><dc:creator><![CDATA[w6kme@mastodon.radio]]></dc:creator><pubDate>Tue, 12 May 2026 21:18:10 GMT</pubDate></item></channel></rss>